Does this detailed warning label look familiar? Perhaps you have seen one, or at least one that resembles this in a commercial or industrial facility.

With all of the hype and conversation in recent years revolving around “arc flash,” it is likely due-time that we all start talking about shock, shock hazard and shock risk assessment.

Depending on how you break it down, there are about seven steps in the Canadian Electrical Code for completing a good shock risk assessment. Specific details are in the standard (2015 edition) but in Clause 4.3.4.1 “Shock risk assessment,” you will find three basic determinations:

1. Voltage to which personnel will be exposed
2. Boundary requirements
3. PPE necessary to minimize the possibility of electric shock

A competent and qualified electrical person can usually, and quite easily, determine the voltage(s) to which personnel could be exposed, when they know the work at hand.

As seen in the warning label, there are two boundary requirements in Z462-15 (the third boundary requirement — Prohibited — was removed from the 2015 version). Clause 4.3.4.3 gives specific details for the Limited Approach Boundary, which applies to approach by unqualified persons, working at or close to the Limited Approach Boundary, and entering the Limited Approach Boundary.

Having said all of this, what is actually meant by the “Limited and Restricted Approach Boundaries?” It can be referred to as the “Electrical Safety Zone” or “Safe Work Area.” The Limited Approach Boundary is the furthest of the two boundaries (within the electrical safety zone). Both, the limited approach, and the restricted approach, are dependent on the nominal system voltage in AC systems and the difference in potential in DC systems.

As many of us are aware when we troubleshoot or perform diagnostic work in a busy or high traffic area, it tends to draw an audience of spectators. Whether it’s asking questions or taking pictures, people’s curiosity can unintentionally put them in harms way. Something that we as tradespeople have allowed to happen for decades. This is where CSA Z462-15, and in particular the Limited Approach Boundary, comes in and lends us a hand. It must be stressed that the Limited Approach Boundary (Electrical Safety Zone) be established. Do not necessarily be focused on the exact distances prescribed in CSA Z462-15 or on the warning label. Be more focused on overseeing this work area and not permitting the spectators, including supervisors and managers, to gather around or encroach. CSA Z462-15 does allow an unqualified worker to cross the Limited Approach Boundary, however they must be escorted and briefed on the hazards by the qualified worker. In addition, by no means can an unqualified worker cross the Restricted Approach Boundary.

So, the next time you are performing diagnostics or troubleshooting in an open panel while energized, remember to establish a safe work area and ensure to keep the unqualified persons away and out of harms way.

Len Cicero is the owner and president of Lenco Training and Technical Services. He is a master electrician, and a certified electrical safety compliance professional. He is recognized by the industry, and his colleagues as a specialist in lockout and workplace electrical safety. Len is involved with CSA-460 as the technical committee chairperson, and is a founding and executive member of CSA-462. He is also a member of the Canadian Society of Safety Engineers and is the past president of the Halton Chapter of the Ontario Electrical League. For more information about Lenco Training and Technical Services, visit www.archflash.ca.

This article was reprinted with permission from Ontario Electrical League. It was first published in the Spring 2018 issue of OEL Dialogue; www.oel.org

 

Related Articles


Latest Articles

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…


Changing Scene

  • Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    January 19, 2026 Leviton Canada is proud to announce its partnership with The Titan Group, who will now represent Leviton’s Residential and Commercial & Industrial product lines across the Midwest provinces, effective January 1, 2026. “We’re excited to begin our partnership with Titan,” said Bill Tischner, Western Sales Director. “Their industry expertise, commitment to service, Read More…

  • Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    January 19, 2026 Hammond Power Solutions is pleased to announce the appointment of Xavier Biot as Vice President, Strategic Accounts. In this role, he will lead HPS’s strategic account teams. He will partner with customers to align transformer and power quality solutions with evolving electrification, sustainability, and operational needs. His focus will be on helping Read More…

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…