Le Groupe Génitique: Innovation in the Heart of Quebec and Elsewhere

Groupe Genitique

 

Le Groupe Génitique has been in operation for more than 25 years, serving the hydropower and industrial process sectors. The firm provides electrical contractor and general contractor services, and is recognized for its technical expertise in the design, operation and maintenance of hydroelectric facilities and transmission and distribution networks.

With innovation and rigour, the team designs, implements and manages engineering projects. It also provides specialized equipment to support their clients in all phases of their projects, including automation, control and protection systems. The firm’s technical expertise is recognized both in the design and rehabilitation than in providing assistance to the operation and maintenance of hydroelectric and transport and energy distribution networks.

It helps owners and users optimize industrial processes or implement new technologies. For example, Le Groupe Génitique managed the engineering and integration of Quebec’s first biogas plant, in Saint-Hyacinthe. In 2009, Le Groupe Génitique was mandated to provide complete engineering services for implementation, construction and commissioning of the plant’s bio-methanization process. A biological process is used to treat industrial wastewater and effluent. One characteristic of this treatment is continuous production of organic sludge. However, in recent years, this sludge is an increasing problem due to the ever-growing transportation and disposal costs.

Responding to the wishes of municipal leaders for a permanent, environmentally responsible solution, Le Groupe Génitique installed three anaerobic digesters as well as a dryer system. Find out more: http://www.genitique.com/en/.

 

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene