Test Your Knowledge of the Canadian Electrical Code – Part 1 — The Answers: Fire Alarm Systems

EIN Code Quiz2 400

June 11, 2021

In the last installment, you had the opportunity to answer our questions about the Code and best practices. Here are the answers to those questions.

Fire Alarm Systems, Smoke and Carbon Monoxide Alarms, and Fire Pumps

Q: What rule specifies the requirements for insulated conductors and cables in fire alarm systems and what are the requirements?

A: Rule 32-100 specifies the requirements for insulated conductors and cables in fire alarm systems which include:

  • copper material
  • ampacity
  • use of optical fiber cables
  • use of stranded conductors
  • insulation rated at 300 volts
  • determining wire size for raceways or integral assemblies
  • selection in accordance with rules 12-102(3)or 12-122(1)

Q: What rule requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box from the normal power supply and the fire pump transfer switch or controller, except?

A: Rule 32-306 requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box from the normal power supply and the fire pump transfer switch or controller:

  • Except a circuit breaker that is permanently labeled identifying it as a fire pump disconnect.
  • In addition, the circuit breaker must be lockable in the closed position and may be in the separate service box as in Rule 32-304

Q: In the case where this circuit breaker is installed in an emergency power supply circuit between the emergency power source and the fire pump transfer switch, the rating of the circuit breaker shall be?

A: As per rule 28-200:

  • Be set or rated to not less than the rating of the overcurrent protection provided integral with the fire pump transfer switch
  • Indefinitely carry the locked rotor current of the fire pump
  • Where it is installed in a normal supply circuit be rated not less than the overcurrent protection of the fire pump controller
  • Where the circuit breaker is installed in an emergency supply feeder between the emergency generator and the fire pump transfer switch, the feeder must bypass the generator main circuit breaker and be connected directly to the emergency generator.

Go HERE to discuss

Related Articles


Latest Articles


Changing Scene

  • Cascadia Sales Representing Eaton in BC

    Cascadia Sales Representing Eaton in BC

    May 21, 2026 Cascadia Sales are thrilled to announce that effective May 11, 2026, they will officially be representing an expanded portfolio of Eaton brands across British Columbia. “Adding Crouse-Hinds, B-Line, Bussmann, and Cooper Power series to our lineup allows us to provide even more comprehensive electrical solutions to our BC partners,” the company said Read More…

  • Nedco Opens New Kelowna Branch

    Nedco Opens New Kelowna Branch

    May 21, 2026 In a recent announcement from Nedco, the company celebrated the Grand Opening of the new Kelowna branch on Friday, May 8, 2026. Nedco invited attendees to explore the new 11,000 sq. ft. facility designed to conveniently serve Okanagan customers. The tour of the new facility took place from 11:00 AM to 2:00 Read More…

  • Leviton Canada Partners with NRG INTENSI‑T Inc. to Strengthen the Presence of Lighting Controls in the Quebec Region

    Leviton Canada Partners with NRG INTENSI‑T Inc. to Strengthen the Presence of Lighting Controls in the Quebec Region

    May 21, 2026 Leviton Canada is proud to announce its partnership with NRG INTENSI-T Inc., who will now represent Leviton’s Lighting Controls product line throughout the Quebec region, effective May 1, 2026. This new partnership reflects Leviton’s commitment to strengthening its lighting controls presence in Quebec through experienced, market-focused representation. With deep regional knowledge, an Read More…

  • Mac’s II Agencies Expands ABB Partnership into UPS Solutions

    Mac’s II Agencies Expands ABB Partnership into UPS Solutions

    May 21, 2026 As demand increases for resilient, always-on power for commercial, industrial, and mission-critical environments, Mac’s II Agencies is strengthening its Power Quality portfolio with ABB systems engineered for diverse conditions. With a broad range of sizes and configurations available, engineers, contractors, and end users can specify power backup and protection solutions with continued confidence, backed Read More…