B.C. Building Code Updated to Support More Homes

September 15, 2024

Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options.

The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will make it possible to build housing projects on smaller lots and in different configurations, while allowing more flexibility for multi-bedroom apartments, more density within areas of transit-oriented developments and the potential to improve energy efficiency in buildings. Previously, the BCBC called for at least two egress stairwells in buildings three storeys and higher.

To ensure the continuing safety for residents, all new SES designed buildings will require specific safety measures, including sprinklers, smoke-management systems and wider stairwells.

Single egress stair building designs build on advancements in fire and life safety, while requiring only one egress stairwell. These building designs are currently implemented in major cities, such as Seattle and New York, and support the supply of more homes for people where development was previously not possible due to lot size, cost of land assembly and other limitations.

The BCBC SES changes were drafted following the release of the report, Single Egress Stair Building Designs: Policy and Technical Options, in June 2024. The report was informed through engagement with industry professionals, including engineers, architects and representatives of the fire services community.

From July 2024 to August 2024, representatives from the fire-service community, and specific groups from the building sector and local governments were invited to review and comment on draft code language. The Ministry of Housing, working with the Office of the Fire Commissioner, will undertake further engagement to address the safety concerns raised.

The Province will continue working with other partners across Canada to carry on discussions about how their building codes can be innovated to include SES designs and other features aimed at helping increase housing supply. This includes looking to see how government can develop standards to permit other design innovations, such as mixed-use occupancies, underground parking, and alternate requirements for two- to three-storey SES buildings.

This work is part of the Province’s Homes for People action plan. Announced in 2023, the plan builds on historic action to deliver housing since 2017 and sets out further actions to deliver the homes people need quicker, while creating more vibrant communities in B.C.

Quick Facts:
  • BC Building code requirements regarding SES designs had not been updated since 1998.
  • Building codes in Canada are based on the National Building Code of Canada, first drafted in 1941.
  • Since then, many jurisdictions around the world have adapted their building codes and regulations to permit much larger buildings with a single means of exit.
  • Source

Related Articles


Latest Articles


Changing Scene

  • Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    May 12, 2025 Hammond Power Solutions (HPS), a leader in dry-type transformers and power quality solutions, is pleased to announce the appointment of Linda Nadeau Sanford as the new Western Regional Sales Manager. Linda will play a key part in driving sales and revenue across the Western Canada region. She will oversee territory management, advance… Read More…

  • Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    May 12, 2025 Electricity Human Resources Canada (EHRC) is proud to announce Susanna Zagar (she/her), Chief Executive Officer of the Ontario Energy Board (OEB), as the recipient of the 2025 Agent of Change Award. This recognition celebrates Ms. Zagar’s remarkable leadership and commitment to diversity, equity and inclusion (DEI) in the electricity sector. Since stepping… Read More…

  • AD Reports Huge Jump in Member Sales Through Three Months of 2025

    AD Reports Huge Jump in Member Sales Through Three Months of 2025

    May 12, 2025 AD reports that member sales in the first three months of 2025 increased 23% to a record $24 billion across the group’s 14 divisions and three countries. AD welcomed over 550 new members in the first quarter through both organic growth and the IMARK Electrical merger. AD members also acquired another 10… Read More…

  • Legrand Introduces Wattstopper i3 Building Management Platform

    Legrand Introduces Wattstopper i3 Building Management Platform

    May 12, 2025 Legrand® has announced the launch of the Wattstopper i3 Platform, a next-generation lighting and building intelligence solution powered by KODE Labs, a global leader of advanced smart building technology.  The partnership positions Legrand to lead the lighting controls industry into a new era of unified experiences, seamless integrations, and data-driven control, making it easier… Read More…