BC Hydro Energy Storage Incentive

August 18, 2025

Energy storage systems (ESS) provide reliability and resiliency for businesses and the grid alike while helping to reduce GHG emissions as an alternative to diesel backup generation. Storing energy can help manage peak demand charges, reduce peak loads on the grid and provide electricity during outages. 

The offer

BC Hydro are offering incentives to their business customers to support the acquisition, installation, and operation of ESS. Once installed, BC Hydro will have the ability to dispatch the ESS automatically in response to changing conditions on the grid. These dispatch signals trigger the battery to discharge, powering the facility it’s attached to and reducing demand on the grid. The battery will then recharge later in the day or at night.

How it works

The incentive provided is based on the amount of battery capacity the customer nominates to be available for demand flexibility or demand response events.  The incentive is calculated as the lesser of:

  • $10,000 X kW nominated
  • $10,000 X kWh/4 nominated
  • 80% of eligible project costs.

Eligibility

To be eligible for BC Hydro’s energy storage incentive (ESI), customers must meet the following criteria:

  • Be on a general service or irrigation rate under the Electric Tariff.
  • Plan to install a new battery. Batteries that have already been purchased
    or installed are not eligible.
  • Have an operating smart meter
  • Must complete applicable net metering or generator interconnections process. Systems must be non-exporting to the grid.
  • Must install and energize an ESS that meets all the system requirements of the program within 24 months of completing a distribution generator interconnections facility study or the net metering application process.
  • Agree to a 10-year contract to provide demand flexibility services via the ESS to BC Hydro.
  • Provide reliable demand flexibility year-round within the following
    parameters:
    • Maximum duration (hours /event): 4
    • Maximum daily frequency: 2
    • Minimum hours between events: 5
  • Must reliably respond to flexibility dispatch events. Performance is considered reliable when the ESS is charged to provide at least 85% of its nominated capacity for 85% of all demand response events, as measured at the start of the event. Reliability is assessed annually.
  • Must connect to BC Hydro software platform via IEEE 2030.5, SCADA, established API or other method approved by BC Hydro to receive event signals.

How to apply

See BC Hydro’s energy storage system (ESS) application process [PDF, 96 KB] for details. You’ll also need our incentive application workbook [XLS, 167 KB] to begin the process. 

Resources

For more information, see our Customer manual – Energy storage systems [PDF, 635 KB].

Note

Tesla products are not eligible

The Government of B.C. and BC Hydro are taking action to preference Canadian goods in our rebate programs going forward and to exclude, where practicable, U.S. produced goods. As of March 12, 2025, Tesla products are not eligible for Energy Storage Incentive offer. If you’re already reviewing Tesla products as a solution for your energy storage system needs, please note that the requirements and technical specifications can readily be transferred to another manufacturer/ vendor.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…

  • IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    April 27, 2026 In 2026, IDEAL Electrical will support four global Habitat for Humanity activations across Greater Toronto, Greater Chicago, the United Kingdom and Los Angeles/Southern California. These efforts will bring together IDEAL employees, electricians and apprentices, industry partners and electrical influencers to contribute more than 500 volunteer hours, $100K in materials and invaluable electrical skills Read More…

  • Ontario Investing $300 Million to Build and Upgrade Local Sport and Recreation Facilities

    Ontario Investing $300 Million to Build and Upgrade Local Sport and Recreation Facilities

    April 20, 2026 The Ontario government is investing an additional $300 million in the Community Sport and Recreation Infrastructure Fund (CSRIF) to build and upgrade sport and recreation facilities across the province. Announced as part of the 2026 Ontario Budget: A Plan to Protect Ontario, this brings total government funding for the program to $500 million, Read More…