BC Hydro Energy Storage Incentive

August 18, 2025

Energy storage systems (ESS) provide reliability and resiliency for businesses and the grid alike while helping to reduce GHG emissions as an alternative to diesel backup generation. Storing energy can help manage peak demand charges, reduce peak loads on the grid and provide electricity during outages. 

The offer

BC Hydro are offering incentives to their business customers to support the acquisition, installation, and operation of ESS. Once installed, BC Hydro will have the ability to dispatch the ESS automatically in response to changing conditions on the grid. These dispatch signals trigger the battery to discharge, powering the facility it’s attached to and reducing demand on the grid. The battery will then recharge later in the day or at night.

How it works

The incentive provided is based on the amount of battery capacity the customer nominates to be available for demand flexibility or demand response events.  The incentive is calculated as the lesser of:

  • $10,000 X kW nominated
  • $10,000 X kWh/4 nominated
  • 80% of eligible project costs.

Eligibility

To be eligible for BC Hydro’s energy storage incentive (ESI), customers must meet the following criteria:

  • Be on a general service or irrigation rate under the Electric Tariff.
  • Plan to install a new battery. Batteries that have already been purchased
    or installed are not eligible.
  • Have an operating smart meter
  • Must complete applicable net metering or generator interconnections process. Systems must be non-exporting to the grid.
  • Must install and energize an ESS that meets all the system requirements of the program within 24 months of completing a distribution generator interconnections facility study or the net metering application process.
  • Agree to a 10-year contract to provide demand flexibility services via the ESS to BC Hydro.
  • Provide reliable demand flexibility year-round within the following
    parameters:
    • Maximum duration (hours /event): 4
    • Maximum daily frequency: 2
    • Minimum hours between events: 5
  • Must reliably respond to flexibility dispatch events. Performance is considered reliable when the ESS is charged to provide at least 85% of its nominated capacity for 85% of all demand response events, as measured at the start of the event. Reliability is assessed annually.
  • Must connect to BC Hydro software platform via IEEE 2030.5, SCADA, established API or other method approved by BC Hydro to receive event signals.

How to apply

See BC Hydro’s energy storage system (ESS) application process [PDF, 96 KB] for details. You’ll also need our incentive application workbook [XLS, 167 KB] to begin the process. 

Resources

For more information, see our Customer manual – Energy storage systems [PDF, 635 KB].

Note

Tesla products are not eligible

The Government of B.C. and BC Hydro are taking action to preference Canadian goods in our rebate programs going forward and to exclude, where practicable, U.S. produced goods. As of March 12, 2025, Tesla products are not eligible for Energy Storage Incentive offer. If you’re already reviewing Tesla products as a solution for your energy storage system needs, please note that the requirements and technical specifications can readily be transferred to another manufacturer/ vendor.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Supporting Enoch Cree Nation’s Long-Term Housing Strategy and Community Growth

    Supporting Enoch Cree Nation’s Long-Term Housing Strategy and Community Growth

    November 9, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $30 million loan towards enabling infrastructure for critical housing development on ECN reserve lands, near Edmonton, Alberta. The project will address exponential housing pressures within the community, allowing ECN members to return to community while supporting long-term growth on reserve.  The… Read More…

  • BCCSA Invests $100,000 to Strengthen BC’s Future Construction Workforce

    BCCSA Invests $100,000 to Strengthen BC’s Future Construction Workforce

    November 5, 2026 The British Columbia Construction Association (BCCA) is pleased to recognize a generous $100,000 contribution from the BC Construction Safety Alliance (BCCSA) Research, Development, and Opportunity Fund (RDO Fund) in support of Honour the Work, a national initiative dedicated to introducing young people to the skilled trades and building awareness of career opportunities… Read More…

  • New Tool in New Brunswick Proposed to Encourage Development of Vacant Properties

    New Tool in New Brunswick Proposed to Encourage Development of Vacant Properties

    November 5, 2026 The government has introduced amendments to the Local Governance Act that, if passed, would give local governments the authority to develop and impose a vacant property levy. “Local governments have been asking for more tools to help put vacant properties to better use,” said Local Government Minister Aaron Kennedy, who is also… Read More…

  • TechnoVE EcoWatt Program

    TechnoVE EcoWatt Program

    November 5, 2026 TechnoVE believes that every charge can have a positive impact, for the environment and for your wallet. That’s why they have created the EcoWatt Program: an exclusive initiative that allows you to make the most of your energy consumption while contributing to the ecological transition. Requirements Terminal compatibility: To perform this update,… Read More…