A cold climate, ultra-reliable renewable hydropower and an expanse of flat land make Canada a hotbed for data centres. This case study showcases an expert solution provided for a leading global financial institution by S&C Electric Canada Ltd.

Customer challenge

A global financial institution that processes transactions 24×7 needed complete power protection for two data centres. Their goal was zero downtime for the cooling systems’ large mechanical loads and the computing equipment in the event of a utility power outage. Uninterruptible power for both systems would also eliminate the need for chilled water storage tanks for data centre cooling. And, because both centres would expand in the future, they needed a highly scalable, efficient solution.

Protecting sensitive loads and improving operations is an increasing challenge for financial firms as their data centres grow. For higher power loads (over 6 MW), conventional low-voltage uninterruptible power supply (UPS) systems do not offer “economy of scale” as loads grow. This financial leader needed state-of-the-art protection, including non-stop cooling and redundant protection.

The institution’s design engineers turned to S&C, whose expertise in medium-voltage switchgear design enabled them to offer the innovative PureWave UPS XT System. No other supplier offers a medium-voltage, battery-based, extended-runtime solution. The UPS XT’s simplified architecture, 100% redundancy, ability to operate at 13.8 kV, 98.8% efficiency, and 15-minute battery runtime at full load made it ideal for protecting critical loads. And, its modular design makes adding capacity easy, in 2-MW increments up to 20 MW per system, to accommodate data centre growth. High scalability at medium voltage is a benefit other systems don’t offer.

For their new data centre, they selected an 8-MW PureWave UPS XT, scalable up to 12 MW for future expansion. For their existing data centre, they chose a 6-MW UPS XT, scalable up to 10 MW. Both systems ensure continuous cooling and protect computing equipment. Applied with backup generators, the systems ensure zero downtime during extended outages and other power disturbances.

Outcome

With the PureWave UPS XT System, the financial institution gained total data centre protection, from their mission-critical applications to their cooling systems, eliminating the maintenance and costs of chilled water storage tanks. The UPS XT’s unmatched scalability allows for future expansion and whole-facility backup, even in a 2N configuration. Furthermore, its medium-voltage operation simplifies power distribution with less hardware than conventional systems. Their 20-year battery ensures maximum data centre protection and power backup. And, because the UPS XT runs only during power interruptions and operates at an extremely high efficiency, the customer will realize significant annual energy cost savings.

 

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • Luxxbox Launches Quick Ship Program to Accelerate Project Timelines

    Luxxbox Launches Quick Ship Program to Accelerate Project Timelines

    July 16, 2025 Luxxbox announces the launch of its new Quick Ship Program, designed to provide architects, designers, and project managers in the United States and Canada with expedited access to a curated selection of their most in-demand acoustic lighting products. With a two-week turnaround from order to dispatch, the program ensures that project timelines… Read More…

  • ECS Earns Platinum Status for 8th Consecutive Year in Canada’s Best Managed Companies Program

    ECS Earns Platinum Status for 8th Consecutive Year in Canada’s Best Managed Companies Program

    July 16, 2025 Electrical Cable Supply (ECS), Canada’s largest independently owned wire and cable distributors, is proud to announce its re-certification with the prestigious Platinum designation in Deloitte’s Canada’s Best Managed Companies program for the eighth consecutive year. This announcement recognizes ECS’s sustained excellence in strategy, innovation, culture, and strong financial performance. The Canada’s Best… Read More…

  • Nexans Canada Partners with Skills Compétences Canada to Sponsor WorldSkills Team Canada 2026

    Nexans Canada Partners with Skills Compétences Canada to Sponsor WorldSkills Team Canada 2026

    July 16, 2025 Nexans has announced its partnership with Skills Compétences Canada (SCC), a not-for-profit organization that actively promotes careers in skilled trades and technologies. As part of the partnership, Nexans will sponsor WorldSkills Team Canada 2026 as they prepare to compete at the 48th WorldSkills Competition, taking place in Shanghai, China, from September 22 to 27, 2026. “At Nexans,… Read More…

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…