Guide to the Canadian Electrical Code, Part I — Instalment 40

Bill Burr

 

Aug 13, 2018

By William (Bill) Burr

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook** but will hopefully provide some help in navigating, while reading the code.

The 24th Edition of the CE-C, Part I, (C22.1-18)* is now available from CSA Group. This discussion of Section 78 — Marine Wharves, Docking Facilities, Fixed and Floating Piers, and Boathouses is based on the new edition.

Rule 80-000 notes that this is a supplementary or amendatory section of the code and applies only to the installation of impressed current cathodic protection systems. Appendix B and the CEC Handbook have additional information and descriptions of cathodic protection.

Rule 80-002 provides wiring methods for DC wiring and includes:

  • conformance to Section 12, except for below ground burial of not less than 450mm or 200mm in raceway or with mechanical protection
  • conformance to Section 18 and Section 20 in hazardous areas

Where DC wiring is installed underground below a Section 20 (Annex J20) Class I hazardous area, it may be buried to a depth not less than 450 mm or 200mm in raceway, providing the wiring is in threaded rigid conduit and sealed in accordance with rules 18-104 or 18-154, where it emerges from the ground.

Rule 80-004 requires that DC cathodic protection wiring be a minimum No. 12 AWG, except for instrumentation and reference electrode leads, and be selected in accordance with rule 12-102 (3) with regard to location and conditions of use.

Rule 80-006 specifies that splices, taps and connections made in conductors underground or exposed to the weather must be

  • made by welding, by a positive compression tool, by crimping and soldering, or by means of a copper, bronze, or brass cable connector
  • sealed against moisture by taping or other method as effective as the original insulation
  • connected to piping by thermit welding, or by a clamp of the same material as the piping or anodic to it
  • connected to a tank or other structure with a welded stud, thermit welding or other permanent means
  • sealed against moisture by the application of a material resistant to any corrosive environment

Rule 80-008 requires that the cathodic protection system rectifier be provided with a dedicated circuit in accordance with the requirements of Section 12.

Rule 80-010 outlines that each rectifier unit of a cathodic protection system have a separate disconnecting means installed

  • readily accessible
  • within sight of, and
  • within 15 m of the unit, or
  • integral to the rectifier and equipped with barriers or other suitable means to protect service personnel from live parts on the line side
  • rendered inaccessible to unauthorized persons by a lockable cover
  • labelled in a conspicuous, legible, and permanent manner identifying it as the disconnecting means for a cathodic protection system

Rule 80-012 requires that where the available operating voltage is more than 50V

  • the voltage difference between exposed points of the protected system, or
  • any point in the vicinity of the anodes, and any point 1m away on the earth’s surface, not exceed 10V.

Rule 80-014 requires that the following warning signs and drawings be provided:

  • a marking warning on tanks, pipes and structures that the cathodic protection system not be disconnected unless the power source is turned off
  • a sign, in a conspicuous location adjacent to the disconnecting means of electrical apparatus connected to the cathodically protected structures, advising that the cathodic protection be turned off and a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, be installed before equipment or piping is replaced or modified
  • in a non-hazardous location, a sign advising that the use of a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, may be used as an alternative to turning off the cathodic protection when replacing or modifying the protected equipment
  • a drawing, placed inside or near the rectifier cabinet, showing the location, polarity and anodes of underground cathodic protection wiring
  • a notice, placed in a conspicuous location adjacent to the entranceway of a storage or process container, advising that the cathodic protection system must be turned off before entering the container

In the next instalment, we will be discussing Section 84 – Interconnection of Electric Power Production Sources.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting; billburr@gmail.com

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA.

**Note the CEC Handbook is also published by CSA.

 

Related Articles


Latest Articles


Changing Scene

  • Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    May 12, 2025 Hammond Power Solutions (HPS), a leader in dry-type transformers and power quality solutions, is pleased to announce the appointment of Linda Nadeau Sanford as the new Western Regional Sales Manager. Linda will play a key part in driving sales and revenue across the Western Canada region. She will oversee territory management, advance… Read More…

  • Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    May 12, 2025 Electricity Human Resources Canada (EHRC) is proud to announce Susanna Zagar (she/her), Chief Executive Officer of the Ontario Energy Board (OEB), as the recipient of the 2025 Agent of Change Award. This recognition celebrates Ms. Zagar’s remarkable leadership and commitment to diversity, equity and inclusion (DEI) in the electricity sector. Since stepping… Read More…

  • AD Reports Huge Jump in Member Sales Through Three Months of 2025

    AD Reports Huge Jump in Member Sales Through Three Months of 2025

    May 12, 2025 AD reports that member sales in the first three months of 2025 increased 23% to a record $24 billion across the group’s 14 divisions and three countries. AD welcomed over 550 new members in the first quarter through both organic growth and the IMARK Electrical merger. AD members also acquired another 10… Read More…

  • Legrand Introduces Wattstopper i3 Building Management Platform

    Legrand Introduces Wattstopper i3 Building Management Platform

    May 12, 2025 Legrand® has announced the launch of the Wattstopper i3 Platform, a next-generation lighting and building intelligence solution powered by KODE Labs, a global leader of advanced smart building technology.  The partnership positions Legrand to lead the lighting controls industry into a new era of unified experiences, seamless integrations, and data-driven control, making it easier… Read More…