SPI Systems LCS 2-X-2 Relay Processing Panel

SPI Systems

December 7, 2017

The LCS 2-X-2 is a computerized lighting control systems utilizing microprocessor technology. The LCS 2-X-2 offers effective control of the energy consumption in large and small buildings. The LCS 2-X-2 system is designed for standalone operation, which is programmed through the LCD display on the CPU Board for smaller applications and in a network for larger more complex applications.

The LCS 2-X-2 control system central component is the Relay Processing Panel (RPP). The RPP is capable of supporting 32 inputs (e.g., switches) and 32 relay drivers each capable of driving 2 relays. The output relay design accommodates Panasonic HID lighting relays. Inputs are powered by the RPP therefore, no external power is required.  The inputs accommodate contact closure devices such as switches and motion detectors. The LCS 2-X-2 product line includes momentary contact lighting switches. Each switch has a Dual color LED for on/off status, which is powered by the RPP.

The RPP is designed for flexibility in configuring the inputs and outputs. Output relays can be programmed separately or programmed to “follow” a relay. Inputs are programmable to control multiple output relays. As a network, all inputs and outputs are addressable and programmable from any RPP. Creating a seamless network of panels. Programming is accessible through an RPP (LCD Display), or a laptop plug-in, or a networked PC, or modem. This system’s features include an optional modem connection for off site control, monitoring and troubleshooting.

The scheduling function features a 9-day format. Days 1 to 7 are defined as Monday to Sunday and days 8 and 9 as Holiday schedules. Each day schedule can perform 10 “on” and 10 “off” commands. Every output relay has 9 day scheduling capability.

Scheduled “off” commands can activate a “flicker warning” feature. The “flicker warning” will alert the occupants that the lights are scheduled to turn off. This allows the occupants time to override the “off” command using a wall mounted switch. The zones controlled by the switch are fully programmable. The extended occupancy time can range from 1 minute to 2 hours.

Features

  • Standalone or networked micorprocessor based lighting control panel
  • Up to 24 relays in 16 zones – Panasonic HID
  • Relay “follow” programming
  • 9 day per week schedules (2 holidays)
  • 10 “on” & 10 “off” commands per day
  • Occupants “after hours” override switch programmable up to 2 hours.
  • Input switch configuration – 2 wires (no indicators) or 4 wires (LED indicators)
  • Bi-Color LED switch indicator – red and green
  • Input quick connection – spade connector
  • Space saving size – 23″ wide x 34″ high
  • Network capability with no additional hardware
  • Non-volatile memory
  • Central control – upload/download system parameters
  • Sequential on/off control circuits to avoid load demands

Related Articles


Latest Articles


Changing Scene

  • Mario Mongrain of  Delta Transformers appointed EFC Chair of the Dry-Type Transformer Section

    Mario Mongrain of Delta Transformers appointed EFC Chair of the Dry-Type Transformer Section

    February 3, 2025 Delta Transformers is pleased to announce the appointment of Mario Mongrain, National Sales Manager, as Chair of the Dry-Type Transformers Section of Electro-Federation Canada (EFC). This Section represents manufacturers of dry-type transformers that are voltage changing or isolation devices, which are air-cooled rather than liquid cooled. As part of his role, Mario Mongrain will be focusing on: “I… Read More…

  • CES Announces New Location for Dartmouth Branch

    CES Announces New Location for Dartmouth Branch

    February 2, 2025 City Electric Supply has announced the grand opening of the new location for their Dartmouth, Nova Scotia branch to better serve the community. New location: 10 Morris Dr. Unit 34, Dartmouth, NS B3B 1KB You can join them on February 5th to help celebrate. Read More…

  • Canada Tests a New Prototype Building that was Constructed in Eight Days

    Canada Tests a New Prototype Building that was Constructed in Eight Days

    February 2, 2025 The Minister of Transport and Internal Trade, the Honourable Anita Anand, announced the successful construction of a new prototype building at the drones and robotics test field on the grounds of the former Killaloe Airport. The small, 380 square foot building was built in only eight days, which can be seen in… Read More…

  • Electrozad Announces Wheatland and Northwinds as their GPS Supplier of the Year 2024

    Electrozad Announces Wheatland and Northwinds as their GPS Supplier of the Year 2024

    February 2, 2025 Electrozad is proud to recognize Wheatland and Northwinds as the GPS Supplier of the Year for 2024. Wheatland’s exceptional support and high-quality product offerings have been instrumental in driving growth and securing significant project wins across Electrozad’s markets. One of the highlights of this year was Wheatland’s pivotal role in securing major… Read More…