SPI Systems LCS 2-X-2 Relay Processing Panel

SPI Systems

December 7, 2017

The LCS 2-X-2 is a computerized lighting control systems utilizing microprocessor technology. The LCS 2-X-2 offers effective control of the energy consumption in large and small buildings. The LCS 2-X-2 system is designed for standalone operation, which is programmed through the LCD display on the CPU Board for smaller applications and in a network for larger more complex applications.

The LCS 2-X-2 control system central component is the Relay Processing Panel (RPP). The RPP is capable of supporting 32 inputs (e.g., switches) and 32 relay drivers each capable of driving 2 relays. The output relay design accommodates Panasonic HID lighting relays. Inputs are powered by the RPP therefore, no external power is required.  The inputs accommodate contact closure devices such as switches and motion detectors. The LCS 2-X-2 product line includes momentary contact lighting switches. Each switch has a Dual color LED for on/off status, which is powered by the RPP.

The RPP is designed for flexibility in configuring the inputs and outputs. Output relays can be programmed separately or programmed to “follow” a relay. Inputs are programmable to control multiple output relays. As a network, all inputs and outputs are addressable and programmable from any RPP. Creating a seamless network of panels. Programming is accessible through an RPP (LCD Display), or a laptop plug-in, or a networked PC, or modem. This system’s features include an optional modem connection for off site control, monitoring and troubleshooting.

The scheduling function features a 9-day format. Days 1 to 7 are defined as Monday to Sunday and days 8 and 9 as Holiday schedules. Each day schedule can perform 10 “on” and 10 “off” commands. Every output relay has 9 day scheduling capability.

Scheduled “off” commands can activate a “flicker warning” feature. The “flicker warning” will alert the occupants that the lights are scheduled to turn off. This allows the occupants time to override the “off” command using a wall mounted switch. The zones controlled by the switch are fully programmable. The extended occupancy time can range from 1 minute to 2 hours.

Features

  • Standalone or networked micorprocessor based lighting control panel
  • Up to 24 relays in 16 zones – Panasonic HID
  • Relay “follow” programming
  • 9 day per week schedules (2 holidays)
  • 10 “on” & 10 “off” commands per day
  • Occupants “after hours” override switch programmable up to 2 hours.
  • Input switch configuration – 2 wires (no indicators) or 4 wires (LED indicators)
  • Bi-Color LED switch indicator – red and green
  • Input quick connection – spade connector
  • Space saving size – 23″ wide x 34″ high
  • Network capability with no additional hardware
  • Non-volatile memory
  • Central control – upload/download system parameters
  • Sequential on/off control circuits to avoid load demands

Related Articles


Latest Articles

  • Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    July 30, 2026 Alberta’s building retrofit sector is ready to scale and could generate $5.8 billion in GDP and support 24,000 jobs with $2.5 billion in annual investment — but only if governments, utilities, and industry align on a clear, coordinated strategy. Resilient but Not Ready shows that while Alberta’s retrofit supply chain is adaptable and… Read More…

  • Lighting 101: How to Choose the Right LED Replacement

    Lighting 101: How to Choose the Right LED Replacement

    July 30, 2026 By EB Horsman & Son Not all LED replacements are created equal. Whether you’re replacing a single light fixture in your home or upgrading lighting throughout your building, choosing an equivalent LED replacement isn’t always as simple as matching the wattage or colour temperature. Many homeowners, contractors, facility managers, and property managers… Read More…

  • Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    July 30, 2026 By CSC LED When planning an industrial facility, lighting is often discussed by fixture type—high bays, wall packs, flood lights, emergency lighting, and so on. In reality, successful lighting design starts by understanding how each space is used. Every area of an industrial property has different visual requirements. A parking lot prioritizes… Read More…

  • Gescan Milwaukee Tent Events

    Gescan Milwaukee Tent Events

    July 30, 2026 Take advantage of exclusive event‑day pricing, live hands‑on demos with Milwaukee Specialists, and explore new and featured solutions across power tools, lighting, safety, batteries, and accessories. Enjoy food, giveaways, and prize draws happening at the branch for ONE DAY ONLY! BONUS ITEMS: Visit one of Gescan’s participating locations starting at 7:00 am, don’t… Read More…


Changing Scene

  • Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    July 30, 2026 Copper theft continues to rise across Canada, with serious consequences for communities and the critical services they rely on. In the first half of 2026, Bell has seen a surge in theft and vandalism targeting telecommunications infrastructure, causing service outages that can disrupt Internet, TV and phone services — and, most importantly,… Read More…

  • Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    July 30, 2026 Electrozad, a Sonepar company, is proud to announce the launch of its newly enhanced eCommerce website and new mobile app, marking a significant milestone in the Electrozad’s digital evolution and commitment to delivering the best customer experience. The digital platforms are now available to customers across Southwestern Ontario, making it easier and… Read More…

  • Seacliff Electric Introduce New Regional Manager for Calgary Operations

    Seacliff Electric Introduce New Regional Manager for Calgary Operations

    July 20, 2026 Seacliff Electric are pleased to announce that Joe Niosi has accepted the position of Regional Manager for their Calgary operations. “Joe has been an important member of our team and brings extensive experience in the electrical construction industry, project execution, leadership, and team development. Through his time as our Service & Special… Read More…

  • Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    July 20, 2026 New sentencing provisions recognize serious public safety consequences of crimes targeting electrical infrastructure. The Electrical Safety Authority (ESA) welcomes the federal government’s implementation of provisions within the Bail and Sentencing Reform Act (Bill C-14) that strengthen consequences for crimes that damage or interfere with essential infrastructure, including copper theft. Copper theft is a growing challenge… Read More…