Fluke 1736 and 1738 Three-Phase Power Loggers: Delivering Comprehensive Data to Optimize System Reliability, Savings

March 15 2016

Fluke Corp.’s 1736 and 1738 Three-Phase Power Loggers automatically capture and log more than 500 power quality parameters to give technicians and engineers more visibility into the data needed to make better power quality and energy consumption decisions.

The power loggers capture and log voltage, current, power, harmonics, and associated power quality values to deliver comprehensive data for load studies, energy assessments, harmonic measurements, and voltage event. The Fluke Energy Analyze Plus software provides detailed analysis of energy consumption and power quality, and generates reports automatically.

They feature an optimized user interface, flexible current probes, and an intelligent measurement verification function designed to reduce measurement errors by digitally verifying and correcting common connection errors. Set-up can be further simplified by powering the logger directly from the measured circuit.

The Fluke 1736 and 1738 are the first three-phase power loggers designed to work with the Fluke Connect system of software and wireless test tools. Fluke Connect tools allow technicians to wirelessly transmit measurement data from their test tools to their smartphones for secure storage on the Fluke Connect Cloud and team access from the field. With the Fluke Connect smartphone app, the data from the power loggers can be viewed from a safe distance, reducing the need for protective equipment, site visits, and check-ins.

Find out more: http://www.fluke.com/powerquality.

 >> Source ALL of your Canadian Electrical products in the Goldbook Directory <<
 

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…