Vertiv Liebert PSI5 Lithium-Ion UPS

Vertiv Liebert PSI5 Lithium-Ion UPS

Feb 3, 2021

Lithium batteries are more efficient when it comes to charging and durability. The Liebert PSI5 Lithium-Ion UPS units last twice as long, has faster recharge time, greater power density, and can endure up to 10x more discharge cycles. Compared to traditional valve-regulated-lead-acid batteries lithium-ion batteries have double the life span of up to 10 years. Fewer battery replacements means less expenses accrued over time.

 

 

 

 

Included with The Liebert PSI5

• UPS Unit
• USB Type A to USB Type B cable 1.8 meter (6ft) in length
• Printed quick start guide with safety instructions
• Adjustable 4 post rack mounting kit
• Support base for tower configuration
• TrellisTM Power Insight (free download)

Full Sequenced Battery Testing

The Liebert® PSI5 UPS includes an automatic and manual self-diagnostic test. This feature automatically alerts you when the internal batteries need replacing, it also provides a comprehensive analysis of the condition of the batteries within the UPS.

Advanced Early Warning of UPS System Status

Audible and visual alarms are available to alert you of any input voltage fluctuation (buck/boost), output overload, low battery or replace battery condition.

Configurable Input Voltage Window

Properly match the UPS to incoming utility power and adjust input window and transfer points to ensure regulated power to connected loads is within the selected range.

Programmable Outlet Group

Extend run time when on battery power by power-cycling connected equipment and shedding less-critical loads.

Go HERE for more information.

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 18 Hazardous Locations

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 18 Hazardous Locations

    September 9, 2024 By William (Bill) Burr[ii] The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B,… Read More…

  • EV Charger Installation Grant Program – Submission Deadline September 19th

    EV Charger Installation Grant Program – Submission Deadline September 19th

    September 9, 2024 The Zero-Emission Vehicle Infrastructure Program (ZEVIP), managed by Natural Resources Canada (NRCan), is designed to enhance the accessibility of electric vehicle (EV) charging stations across Canada. This initiative supports the deployment of both Public & Private EV Chargers. CURRENT PROGRAM TOTAL VALUE – $120 Million SUBMISSION DATE – September 19, 2024 For accepted… Read More…

  • Electrical Industry Day of Recognition – October 6, 2024

    Electrical Industry Day of Recognition – October 6, 2024

    The Electrical Injury Day of Recognition is sponsored by the Electrical Contractors Association of Alberta, the Canadian Electrical Contractors Association, the Electrical Contractors Association of British Columbia, and the  National Electrical Trade Council. The Canadian electrical industry is calling on all tradespeople and those who benefit from them, to set aside October 6 as a day to raise awareness… Read More…

  • Take the Lesson

    Take the Lesson

    September 2, 2024 By Keith Sones, seasoned utility industry executive “I really don’t want to do this.” “You have to Keith. You have no choice. You can’t leave him hanging” replied my wife. I stared at the phone like a child looks at liver on their plate. They know you have to eat it but also… Read More…


Changing Scene

  • More than $89M Invested in Clean Economy Infrastructure Projects Across British Columbia

    More than $89M Invested in Clean Economy Infrastructure Projects Across British Columbia

    September 9, 2024 Communities across the province will benefit from more energy-efficient buildings, clean energy, and better access to clean transportation options after a joint investment of more than $89 million from the federal and provincial governments, and local partners. The North Shore is powering up with green upgrades through two projects, ensuring that communities have enhanced… Read More…

  • Colin Barnett Retires from Nedco After 30+ Year Career 

    Colin Barnett Retires from Nedco After 30+ Year Career 

    September 9, 2024 After more than 30 years of dedicated service, Nedco announces with a mix of emotions the retirement of Colin Barnett, effective February 28th, 2025. Colin is widely recognized for his recent role as the National Director of Supplier Relations, where his steadfast dedication and exceptional leadership have been instrumental in shaping supplier… Read More…

  • Littelfuse Appoints Jebco Agencies As Manufacturer Representatives InSaskatchewan, Manitoba, and Northwestern Ontario

    Littelfuse Appoints Jebco Agencies As Manufacturer Representatives InSaskatchewan, Manitoba, and Northwestern Ontario

    September 9, 2024 Littelfuse is excited to announce the appointment of Jebco Agencies as our official Industrial Business Unit (IBU)manufacturer representative in Saskatchewan, Manitoba, and Northwestern Ontario. With regional offices in both provinces and a strong outside sales presence, Jebco Agencies is well-positioned to deliver Littelfuse’s innovative solutions to customers across these regions. Jebco will… Read More…

  • Guillevin Announces New Victoriaville Branch Opening

    Guillevin Announces New Victoriaville Branch Opening

    September 9, 2024 Guillevin has announced their new branch in Victoriaville will be opening September 19th. “This expansion marks an important milestone for our business as we continue to grow and serve our customers with even more proximity and commitment. We look forward to welcoming you to our new branch, where our dedicated team is… Read More…