New Arlington Zinc MC Cable Fittings

Arlington Zinc MC Cable Fittings

May 9, 2021

Arlington’s low cot MC cable fittings in a variety of sizes, are super convenient and cost-effective. Each fitting has a built-in end stop, but also comes with additional end stop bushings that accomodate different size cable bundles. ONE trade size fits several cable sizes.

If required, using an end stop bushing is fast and easy. There’s no need to remove the strap. Just loosen the screws and insert the bushing that works the best with the cables you’re installing in dry locations.

Installation

1.) Simply loosen the screws and insert end stop bushing if necessary. Slip connector onto MC cable. Retighten screws on strap

2.) If you are using an end stop bushing, determine which one to use by sizing it to the cable bundle (not the metal jacket). Incorrect size shown her. The metal jacket should never go through the end stop.

3.) Insert the appropriate end stop bushing, making sure that the half-moon shape is positioned at the top of the connector

• cULus Listed for PVC jacketed cable when terminating in a dry location.

• One trade size can fit several cable sizes.

• Built-in end stop in fitting.

• Reduce inventory.

Go HERE for more information.

Related Articles


Latest Articles

  • On the Path to $1 Million: Celebrating $815,509 Raised for Canada’s Children’s Hospitals 

    On the Path to $1 Million: Celebrating $815,509 Raised for Canada’s Children’s Hospitals 

    March 5, 2026 Article by Gescan Gescan is proud to share an incredible milestone: since 2022—together with our customers, supplier partners, and employees—we’ve have raised $815,509 in support of children’s hospitals across Canada. Through our annual charity golf tournaments, branch-led fundraising events and generous employee contributions, this collective effort continues to make a meaningful difference for young children and their families.  WHY THIS Read More…

  • Why Business ERP Software Integrations Matter for Modern Estimating Teams

    Why Business ERP Software Integrations Matter for Modern Estimating Teams

    March 2, 2026 By Melvin Newman, Patabid CEO Construction estimating is a high-stakes game. For large electrical contractors managing multiple projects, millions in material costs, and dozens of estimators, the margin for error is razor-thin. A misquoted job doesn’t just lose money—it can tie up crews, strain supplier relationships, and ripple through your entire operation. Read More…

  • Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    March 2, 2026 This International Women’s Day, the Ontario Building and Construction Tradeswomen (OBCT) proudly celebrates the leadership, resilience, and collective power of women in the trades across Ontario. This year’s theme is Give to Gain, which highlights the strength of reciprocity and collective support. When tradeswomen, organizations, and communities uplift each other through generosity, opportunities for women Read More…

  • Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    March 2, 2026 This recall involves Purevolt Photoelectric Smoke Detector model SD119-4 for fire alarm systems, compatible with 4 wires, 12V DC. The product measures 100mm x 48mm and is intended for indoor use, with ceiling or wall mounting. The model number can be found on the label affixed to the back of the product. Issue Health Canada’s sampling Read More…


Changing Scene