Cooper Lighting Solutions Introduces New 1200W Low-Voltage Power Module

Cooper Lighting Solutions 1200W Low-Voltage Power Module

June 21, 2021

Cooper Lighting Solutions has announced the addition of a new 1200W Low-Voltage Power Module to its market-leading WaveLinx Wireless system. With the introduction of the module, WaveLinx now features a hybrid solution that combines the benefits of both wireless connected lighting technology with a class 2 low-voltage microgrid. The new power module was designed to solve real-world challenges within the electrical contractor community.

“With wages in the construction industry outpacing the inflation rate and the increase of wiring costs, electrical contractors are looking for solutions to get the job done faster and at a lower cost,” said Eric Jerger, VP of Indoor Lighting and Connected Systems. “The module simplifies the design and installation of lighting systems by combining the benefits of click-n-go class 2 wiring for luminaires and wireless communication for controls. This combination can significantly reduce installation time and installed project cost in applications like schools, offices, and healthcare facilities.”

Each power module is capable of supporting dozens of low-voltage luminaires across one or multiple rooms. The cable providing low-voltage power also provides individually addressable luminaire communication. The module is fully integrated with the WaveLinx system, enabling contractors to use WaveLinx wireless accessories (sensors, keypads, receptacles) to complete their code-compliant lighting system and use Cooper Lighting’s award-winning WaveLinx Mobile App to program the system.

Cooper Lighting low-voltage luminaires are shipped with or without the WaveLinx integrated sensor. The data generated by low-voltage luminaires can be shared with Trellix, Cooper Lighting’s Smart Spaces platform, and other third-party systems to enable value-added applications.

WaveLinx wireless installations manage more than 40 million square feet today. The addition of low-voltage capabilities is expected to accelerate the growth of the WaveLinx footprint as a more economical alternative to both traditional wiring and Power over Ethernet (PoE) installations.

Go HERE for more information.

Related Articles


Latest Articles


Changing Scene

  • Save the Date: Ontario Apprenticeship Summit 2026 – November 4, 2026

    Save the Date: Ontario Apprenticeship Summit 2026 – November 4, 2026

    July 6, 2026 Skilled Trades Ontario (STO) is pleased to announce that the third annual Ontario Apprenticeship Summit will take place during National Skilled Trades and Technology Week. Industry partners, skilled trades professionals, and apprentices are invited to attend the Toronto Congress Centre on Wednesday, November 4, 2026. The Ontario Apprenticeship Summit 2026 is focused… Read More…

  • Fort McMurray Apprentice Electrician to Represent Canada at Skilled Canada National Competition

    Fort McMurray Apprentice Electrician to Represent Canada at Skilled Canada National Competition

    July 6, 2026 In recognition of World Youth Skills Day, which underscores the vital role of skills development among young people, Skills/Compétences Canada (SCC) is proud to officially announce the 31 talented members of WorldSkills Team Canada 2026.These young competitors will begin their training to prepare for the 48th WorldSkills Competition, in Shanghai, China, which will be held… Read More…

  • Westburne Celebrates 100 Years with Brandon Trade Show

    Westburne Celebrates 100 Years with Brandon Trade Show

    July 6, 2026 Recently, Westburne hosted over 200 guests and over 60 partners and suppliers at their Brandon Trade Show to celebrate 100 years of Westburne. “Westburne’s annual Midwest Tradeshow welcomed more than 220 attendees in Brandon this year, including representatives from over 60 partner businesses and suppliers. Taking place annually for over 15 years,… Read More…

  • B.C. Expands Energy Efficiency Program to Provide No-Cost Retrofits to Homeowners, Tenants

    B.C. Expands Energy Efficiency Program to Provide No-Cost Retrofits to Homeowners, Tenants

    July 3, 2026 Together with BC Hydro, FortisBC and Natural Resources Canada, the Province is supporting families with lower incomes to save money on their utility costs through home-energy improvements.  “We are taking action to help people lower their utility bills by expanding our home energy-efficiency programming for lower-income families,” said Adrian Dix, B.C.’s Minister… Read More…