Champion Flame Shield Phenolic Conduit

June 1, 2026

Champion Flame Shield Fiberglass Phenolic Conduit System, is a 2-hour fire rated electrical conduit system that holds its own in a number of environments, whether damp or dry, hot or cold. Featuring a high temperature 2-hour fire rating that meets UL2196 (2 hours@1850°F), excellent corrosion resistance, a low coefficient of thermal expansion and low-smoke characteristics, this 2- hour fire rated conduit is the No. 1 choice for surface-mounted 2-hour fire-rated electrical conduit systems for transit and passenger rail systems.

The Flame Shield® fiberglass raceway system provides for enhanced fire safety, life-safety circuit integrity (when coupled with the correct fire-rated cables), improved system longevity and relief from stray eddy current issues common with some transit systems.

Phenolic
ENHANCED PERFORMANCE OVER OTHER PHENOLIC CONDUIT SYSTEMS
  • Light weight contributes to installation ease, savings and safety
  • Corrosion resistance to many chemicals
  • No burn-through on elbows
  • One of the lowest coefficients of friction of any in-market product
  • Fire rated conduit is able to retain its shape after impact or compression
  • Fire rated conduit withstands extreme conditions and temperatures
  • UL 2196 2-hour fire rated conduit will withstand fire for 2 hours @ 1850°F
  • UL2196 application maximum support spans not to exceed 4 feet.
A leader in safety
  • Fire resistant conduit can be exposed to temperatures up to 1,850°F for two (2) hours
  • Conforms to NFPA 130 requirements
  • Does not emit toxic halogens when burning
  • Low coefficient of thermal expansion
  • Wide resistance to industrial chemicals

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…