Enveloping Warmth: Stelpro Architectural Radiant Panel

July 13, 2026

The Architectural Radiant Panel delivers clean, enveloping, energy‑efficient warmth. Designed for easy integration into a T‑Bar suspended ceiling, it can also be surface‑mounted or recessed using a range of optional accessories.

Advantages

  • Radiant comfort where you need it most: A quiet, discreet, and efficient ceiling-mounted heating solution
  • Free up space. keep the comfort: Direct radiant heat without taking up floor space
  • Direct, even warmth: Heats occupants and surrounding surfaces without air circulation
  • Built for demanding spaces: Ideal for offsetting heat loss or heating an entire space
Enveloping Warmth: Stelpro Architectural Radiant Panel

Specifications

COLOURS

FINISH

  • High-temperature polyester powder coating

MANUFACTURING

  • Reflective foil bonded to the panel’s heating elements
  • High-temperature mineral wool insulation, density 2.5 PSF, 1 in (25.4 mm) thick
  • The front of the panel is made of 22-gauge painted steel. The panel cover is made of 22-gauge satin-finished steel
  • Suspension brackets at the four corners of the panel (suspension cable not included)

ELEMENT

  • Single-conductor heating wire with fluoropolymer insulation evenly distributed across the panel

DENSITY

  • 62.5 to 93.75W/ft2 at rated voltage

CONTROL

  • Line-voltage control circuit for thermostat, timer or switch (not included; must be compatible with the appliance’s voltage and power rating)
  • Stelpro strongly recommends the use of a wall-mounted electronic thermostat for greater comfort

CERTIFICATION

  • CSA STD C22.2 No.46 / UL 2021

INSTALLATION

  • Suspended from the ceiling or fitted into a T-bar suspended ceiling
  • A variety of optional accessories is available for surface mounting using an SF frame on a drywall ceiling, or for recessed installation using an RF frame. An RB option is also available for recessed installation in a non-ventilated ceiling
  • Minimum clearance of 2 in (50.8 mm) above the panel
  • Minimum installation height of 7 ft (2.13 m) from the floor
  • Relocation possible

WARRANTY

  • One year on paintwork, ten years on components

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…