Hilti Now Offers Hand Tools, Power Tools, and Equipment All on Nuron Cordless Battery Platform

February 2, 2025

Hilti North America further delivers on its promise to expand the all-on-one Nuron battery platform with innovation that meets the needs of contractors including the launch of its DD 150-U-22 Cordless diamond core rig, two DSH 600/700 cut-off saws and PR 4/40/40G-22 Rotating Lasers

The new DD 150-U-22 is a universal solution for both hand-held and rig-mounted coring. Powered by Nuron, it is the first core rig on the same battery platform as handheld cordless tools—meaning that it offers contractors the flexibility to use the same set of interchangeable batteries for all Hilti tools, whether for light or heavy-duty applications, without compromising on performance.

nuron battery

Along with the DD 150-U-22, Hilti is adding to its Diamond innovations by unveiling the second generation of two new cut-off saws, the DSH 600-22 ATC and DSH 700-22 ATC, which showcase power, safety and comfort-enhancing features stemming from direct customer feedback.

Hilti is also launching three new Rotating lasers all on the Nuron cordless platform.  The PR 4 for horizontal levelling.  The PR 40, a red laser universal tool, for horizontal, vertical and slope applications and the PR 40G, a universal tool, that offers increased visibility with a green beam. All lasers offer intuitive one-button control, automatic functions within 300 m, and easier alignment for formwork, slope grading, and squaring — ideal for one-person operation. These rotators are backed by Hilti’s rugged design, calibration, and repair service. Plus, smart asset tracking and battery monitoring on the Nuron platform help boost efficiency and simplify tool management.

The company’s development of equipment like the DD 150-U-22 showcases its continued intent to dominate other spaces in construction, beyond concrete and fastening for which it is most well-known.

Go HERE for more information

Source

Related Articles


Latest Articles

  • Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    July 30, 2026 Alberta’s building retrofit sector is ready to scale and could generate $5.8 billion in GDP and support 24,000 jobs with $2.5 billion in annual investment — but only if governments, utilities, and industry align on a clear, coordinated strategy. Resilient but Not Ready shows that while Alberta’s retrofit supply chain is adaptable and… Read More…

  • Lighting 101: How to Choose the Right LED Replacement

    Lighting 101: How to Choose the Right LED Replacement

    July 30, 2026 By EB Horsman & Son Not all LED replacements are created equal. Whether you’re replacing a single light fixture in your home or upgrading lighting throughout your building, choosing an equivalent LED replacement isn’t always as simple as matching the wattage or colour temperature. Many homeowners, contractors, facility managers, and property managers… Read More…

  • Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    July 30, 2026 By CSC LED When planning an industrial facility, lighting is often discussed by fixture type—high bays, wall packs, flood lights, emergency lighting, and so on. In reality, successful lighting design starts by understanding how each space is used. Every area of an industrial property has different visual requirements. A parking lot prioritizes… Read More…

  • Gescan Milwaukee Tent Events

    Gescan Milwaukee Tent Events

    July 30, 2026 Take advantage of exclusive event‑day pricing, live hands‑on demos with Milwaukee Specialists, and explore new and featured solutions across power tools, lighting, safety, batteries, and accessories. Enjoy food, giveaways, and prize draws happening at the branch for ONE DAY ONLY! BONUS ITEMS: Visit one of Gescan’s participating locations starting at 7:00 am, don’t… Read More…


Changing Scene

  • Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    July 30, 2026 Copper theft continues to rise across Canada, with serious consequences for communities and the critical services they rely on. In the first half of 2026, Bell has seen a surge in theft and vandalism targeting telecommunications infrastructure, causing service outages that can disrupt Internet, TV and phone services — and, most importantly,… Read More…

  • Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    July 30, 2026 Electrozad, a Sonepar company, is proud to announce the launch of its newly enhanced eCommerce website and new mobile app, marking a significant milestone in the Electrozad’s digital evolution and commitment to delivering the best customer experience. The digital platforms are now available to customers across Southwestern Ontario, making it easier and… Read More…

  • Seacliff Electric Introduce New Regional Manager for Calgary Operations

    Seacliff Electric Introduce New Regional Manager for Calgary Operations

    July 20, 2026 Seacliff Electric are pleased to announce that Joe Niosi has accepted the position of Regional Manager for their Calgary operations. “Joe has been an important member of our team and brings extensive experience in the electrical construction industry, project execution, leadership, and team development. Through his time as our Service & Special… Read More…

  • Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    July 20, 2026 New sentencing provisions recognize serious public safety consequences of crimes targeting electrical infrastructure. The Electrical Safety Authority (ESA) welcomes the federal government’s implementation of provisions within the Bail and Sentencing Reform Act (Bill C-14) that strengthen consequences for crimes that damage or interfere with essential infrastructure, including copper theft. Copper theft is a growing challenge… Read More…