Luminis Lanches Hollowcore Element Luminaire Family

September 11, 2026

Luminis® has announced the introduction of its Hollowcore Element luminaire family. Designed for indoor and outdoor applications, Hollowcore Element brings focus to architectural spaces through a distinctive open-core form and controlled illumination.

The family is defined by a restrained architectural presence. Its clean circular form is built around a luminous ring and distinctive interior core, creating a balanced expression that feels visually light while maintaining a strong presence within the space.

Luminis Lanches Hollowcore Element Luminaire Family

Hollowcore Element incorporates a carefully engineered optical system designed to deliver even, controlled illumination. A semi-opaque, double-layer lens creates a soft, wide distribution, while the lens geometry helps maintain a clear and composed luminous appearance across the full volume of the luminaire.

To support different design intents, Hollowcore Element is offered in two optical configurations. An open distribution is designed to establish a broader ambient presence, while a metal shade configuration directs illumination downward with greater control and precision.

Hollowcore Element is offered in multiple mounting types, including stem, surface, cable, and Ø4” post top/pole configurations. Together, they allow a consistent architectural expression to extend from interior to exterior applications.

Hollowcore Element is offered in two sizes, Ø19” and Ø30”, with output scaling up to 9,642 lumens in the Ø19 family and up to 24,008 lumens in the Ø30 family, depending on configuration. The family features 90 CRI light quality, multiple CCT options, and project-ready control options to support a wide range of architectural applications.

Hollowcore Element is designed to bring focus back to architectural lighting—helping spaces read more clearly, reinforcing architectural intent, and supporting a more composed visual experience.

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…