Mitsubishi Electric Announces Comprehensive Warranty Coverage for Ecodan WUZ, Its Newest Air-to-Water Heat Pump Solution

September 16, 2026

Mitsubishi Electric Sales Canada Inc. is pleased to announce comprehensive warranty coverage for the Ecodan WUZ, one of the newest additions to its hydronic heating portfolio.

Designed specifically for Canada’s climate, the all-in-one air-to-water heat pump system delivers efficient hydronic heating, cooling, and domestic hot water production in a single solution while simplifying installation for contractors and enhancing long-term confidence for homeowners.

The Ecodan WUZ is backed by one of the most comprehensive warranty programs in the residential air-to-water heat pump category, offering 10-year or 12-year parts and labour warranty coverage through Mitsubishi Electric residential dealer programs. Speak with your local Mitsubishi Electric distributor for complete warranty details.

Part of Mitsubishi Electric’s Ecodan family, which has been installed throughout Europe since 2011, the Ecodan WUZ benefits from years of field-proven performance in hydronic applications. Built with a refrigerant split configuration, the Ecodan WUZ eliminates freeze risk in outdoor piping by keeping the water circuit indoors. This design removes the need for glycol or heat tracing while streamlining installation and reducing maintenance requirements.

The Ecodan WUZ features Mitsubishi Electric’s Hyper-Heating INVERTER® (H2i®) technology, enabling reliable operation in outdoor temperatures as low as -30°C while maintaining strong heating capacity in extreme cold. With a coefficient of performance (COP) of up to 5.05, the system delivers exceptional energy efficiency, helping reduce energy consumption and carbon emissions without compromising comfort across a wide range of residential and commercial applications.

At the heart of the system is a fully integrated hydrobox, combining key hydronic accessories, including a circulation pump, expansion vessel, magnetic filter, booster heater, and plate heat exchanger, into a compact, service-friendly unit. The system distributes heated or chilled water throughout the building, making it well suited for both new construction and hydronic retrofit applications.

The Ecodan WUZ offers a wide range of performance capabilities, including:

  • Year-round hot water production with heating supply water temperatures up to 70°C (LWT), ensuring strong performance and compatibility with existing heat emitters
  • Space heating and cooling capability for all-season comfort
  • An advanced Eco Mode that automatically adjusts water temperature based on outdoor conditions to optimize efficiency without user intervention
  • Available capacities of 2, 3, and 4 tons (24,000 to 48,000 Btu/h)

The system is engineered with low-GWP R-32 refrigerant, supporting sustainability goals while maintaining high performance.

Additional features include:

  • Quiet operation as low as 41 to 45 dB(A) with anti-vibration design
  • Integrated or external zoning capability for customized comfort
  • Boiler integration for hybrid system flexibility
  • Advanced system protections, including automatic air venting and flow monitoring
  • Compatibility with Mitsubishi Electric’s i-Life2 Slim hydronic fan coil units for efficient, space-saving zoned heating and cooling
  • Comprehensive warranty coverage of up to 12 years parts and labour through qualified dealer programs

“Historically, the residential hydronics industry has not fully realized the efficiencies and environmental benefits that heat pump technology has brought to other market segments,” said Tyler Pullen, Applied Product Manager at Mitsubishi Electric Sales Canada. “With air-to-water heat pump adoption gaining momentum in Canada, the Ecodan WUZ reflects our ongoing commitment to expanding our air-to-water and hydronics portfolio. The addition of comprehensive warranty coverage further demonstrates our commitment to supporting dealers and homeowners with long-term confidence in their investment.”

For more information, contact your local distributor or visit: EcodanWUZ.ca

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…

  • Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    September 16, 2026 This recall involves Goal Zero YETI 3000X power stations. The silver and black portable power stations measure about 62 centimetres (24.4 inches) high, 47 centimetres (18.5 inches) wide, 57 centimetres (22.3 inches) deep and weigh approximately 42 kilograms (92 pounds). The power stations have yellow handles and a digital display at the… Read More…


Changing Scene

  • Innovair Solutions Acquires TRM Heating Cables

    Innovair Solutions Acquires TRM Heating Cables

    September 18, 2026 Innovair Solutions has announced the acquisition of TRM Heating Cables, a Toronto-based Canadian company specializing in heating cables for commercial and industrial applications. Founded in 2001, TRM has built strong technical expertise in the sale and installation of specialized products, including self-regulating cables, mineral-insulated cables and electric floor heating systems. The company… Read More…

  • Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    September 17, 2026 From preparing the next generation of skilled workers to supporting one of the world’s largest sporting events, this year’s recipients demonstrate how electrical safety supports Ontario’s future As Ontario electrifies homes, transportation and industry, the Electrical Safety Authority (ESA) has recognized the organizations and individuals helping ensure safety keeps pace with that… Read More…

  • NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    September 17, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $100 million loan with Morguard Corporation to enable energy‑efficient retrofits across a portfolio of approximately 30 properties in Canada. Morguard is a fully integrated real estate firm with more than $24.2 billion in assets under management across North America. Morguard will collaborate… Read More…

  • Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    September 16, 2026 New Canadian-led infrastructure project will help build secure and reliable computing capacity responsibly On September 14, 2026, the Government of Canada welcomed Bell Canada’s planned investment to expand its Bell AI Fabric capacity in Saskatchewan, an important step toward building the sovereign computing capacity Canada needs to compete and succeed in the… Read More…