PLP EV Charging Station Foundation

November 2, 2025

PLP’s EV Charging Station Foundation is a pre-fabricated, precision-engineered solution for EV charging. This durable yet lightweight polypropylene foundation requires no specialized machinery; it can be installed by one person in one day. The EV Charging Station Foundation’s design adapts to fit a wide range of chargers and charger pedestals/poles currently on the market. The aluminum top plate provides a clean finish, is easy to drill, and is an access point for repairs and future upgrades.

Quick and easy installation

  • Pre-manufactured design
  • Easily installed by one person in one day
  • Reduces construction time by weeks
  • Quick and easy site-prep
  • No concrete required

Designed and tested to withstand the harshest environmental conditions

  • Manufactured from durable, weather-resistant polypropylene
  • Tier 15-Rated (22,000 lb compression strength)
  • 150 mph wind tested
  • High water table resistant
  • Frost heave resistant

Creates a convenient access point for chargers

  • Cast aluminum top plate provides easy access for future installs
  • Accommodates most Level 2 chargers and charger pedestals

Multiple wiring configurations

  • Daisy-chain
  • Dead-heading
  • Change-of-direction
  • Accepts up to 4-inch conduit

More Information

Related Articles


Latest Articles


Changing Scene

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…

  • IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    April 27, 2026 In 2026, IDEAL Electrical will support four global Habitat for Humanity activations across Greater Toronto, Greater Chicago, the United Kingdom and Los Angeles/Southern California. These efforts will bring together IDEAL employees, electricians and apprentices, industry partners and electrical influencers to contribute more than 500 volunteer hours, $100K in materials and invaluable electrical skills Read More…