RVE DCC-12 EV Energy Management System 

May 14, 2026

The DCC-12 is a patented Electric Vehicle Energy Management System (EVEMS) that allows a charger to be connected directly to an electrical panel which would otherwise not have sufficient capacity to allow the connection.

RVE DCC-12 EV Energy Management System 

Features

  • Avoids upgrading an electrical panel that is at full capacity
  • Direct billing according to the energy consumed (kWh) by electric vehicles
  • No additional load on the home’s electrical panel
  • Installation with electrical loads up to 100 A
  • Circuit switching feature (load miser) allowing two loads to be installed on the same circuit breaker while preventing them from operating simultaneously
  • Ideal for single-family homes
  • NEMA-3R enclosure for indoor or outdoor installation
  • CSA and UL listed
  • No built-in circuit breaker acting as an intermediary between the charger and the DCC
  • Made in Canada

How it Works

  • Real-time reading of the total panel power consumption with pre-wired current transformers (CT);
  • Detects when total power consumption exceeds 80% of main circuit breaker capacity and temporarily de-energizes the EV charger;
  • Automatically re-energizes the EV charger when the total power consumption is less than 80% of main circuit breaker capacity for more than 15 minutes.

Installation Context

Install a DCC-12 so that you can connect an EV charger directly to the main power supply of the home and when

  • This electrical panel has a maximum capacity of 200A;
  • This electrical panel has already reached its maximum capacity;

For an installation in a multi-unit residential building, try the DCC-11.

See actual DCC-12 installations in single-family homes.

Related Articles


Latest Articles

  • STANDATA Bulletin Section 6 – Services and Service Equipment

    STANDATA Bulletin Section 6 – Services and Service Equipment

    July 27, 2026 The purpose of this STANDATA bulletin is to clarify Section 6 of the 2024 Canadian Electrical Code (CE Code), Part 1, which outlines the installation requirements for services, service equipment, and metering equipment. View the Bulletin: Read More…

  • Behind the Glow: How Neonview Helped Shape Vancouver’s Newest Landmark Roof

    Behind the Glow: How Neonview Helped Shape Vancouver’s Newest Landmark Roof

    July 27, 2026 Some projects are exciting because they’re new. Others are exciting because you can feel how many people had to be exceptionally good at their craft to make them look effortless. The PNE Amphitheatre (Freedom Mobile Arch) is the latter. The notable largest free-span wood roof in North American is the headline, but the lighting is the… Read More…

  • Canada Light Expo: Energy Efficient Lighting Solutions for Modern Businesses

    Canada Light Expo: Energy Efficient Lighting Solutions for Modern Businesses

    July 27, 2026 How Energy Efficient Lighting Can Help Modern Businesses Balance Profitability with Environmental Responsibility In today’s competitive business landscape, organizations are constantly seeking ways to reduce operational costs, improve sustainability, and foster productive work environments. Among the most impactful yet often overlooked areas of optimization is lighting. As businesses strive to balance profitability… Read More…

  • Stelpro Baseboard Heating: Reliable Comfort for Commercial & Residential Spaces

    Stelpro Baseboard Heating: Reliable Comfort for Commercial & Residential Spaces

    July 27, 2026 By EB Horsman & Son As temperatures rise and winter fades into the background, heating systems might not be top of mind. However, spring and summer are actually the ideal time to plan ahead. Installing or upgrading your heating system now can save time, reduce stress, and ensure you are fully prepared… Read More…


Changing Scene