Tool-Free Terminations Brought to you by Legrand

June 1, 2026

The PowerHold™ receptacle device maximizes contractor productivity, reduces errors, and enhances profitability while delivering faster, more reliable results. With fast terminations, superior wiring retention and color-coded levers that ensure accurate connections, this standard receptacle makes the installation process quick, easy, and safe. Unlike traditional receptacles that require multiple tools and longer termination times, PowerHold allows for rapid terminations in 10 seconds or less.  Best suited for MDU, hospitality, prefab, and commercial applications.

The PowerHold receptacle introduces several innovative design elements that distinguish it from conventional wiring devices:

Tool-Free Terminations Brought to you by Legrand

Fast Terminations.

With terminations in 10 seconds or less, PowerHold  significantly boosts your productivity, enabling you to take on more projects and complete them ahead of schedule.

Easy Wiring.

PowerHold makes the wiring process easier and safer with no exposed live components. Easily-accessed break-off tab on both hot and neutral side for fast and easy split-circuit wiring.

Superior Wire Retention.

With a retention force greater than 30 lbs, PowerHold’s custom wire retainer geometry ensures consistent, reliable connections that are twice as strong as the competition.

Sleek, Space-Saving Design.

Shallower than competitors, PowerHold offers a streamlined design without compromising on performance.

Error-Free Installation.

Color-coded levers (white/neutral, black/hot, green/ground) reduce the risk of miswiring, while an audible snap confirms the lever is securely closed.

Tamper-Resistant.

Dual mechanical shutter system to help prevent insertion of foreign objects.

Built for Tomorrow.

Dependable connections that stay secure during use, yet are easily changeable for future updates or renovations.

Perfect for a Variety of Applications.

Ideal for light commercial, hospitality, commercial office, multi-dwelling units, prefabrication and residential applications.

POWERHOLD VS. CONVENTIONAL

PowerHold: Terminates in 10 seconds or less

Conventional: About a minute

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…