WECO Series 308 Flat Plug Distribution Strips

June 10, 2024

The 308 series from WECO comprises a total of seven flat plug terminal distribution strips in the basic version, each with 1 to 16 poles. It also impresses with its minimal connection space, different connection configurations and compact design.

Thanks to the standardized 4.8 or 6.3 flat plug terminals (depending on the version), they are perfect for use in household appliances, instantaneous water heaters or motorhomes, for example.

WECO offers the flat plug terminal versions with and without screw connection, thus guaranteeing quick and safe access to the contacts.

Version ..-101
• 6 x 4,8 mm
• with screw connection
• vertical plug orientation
• 17,5 A (screw); 15 A (plug)

Version ..-102
• 6 x 4,8 mm
• vertical plug orientation
• 15 A (plug)
• without screw connection

Version ..-201
• 6 x 6,3 mm
• with screw connection
• vertical plug orientation
• 17,5 A (screw); 20 A (plug)

Version ..-202
• 6 x 6,3 mm
• vertical plug orientation
• 20 A (plug)
• without screw connection

Version ..-302
• 8 x 6,3 mm
• vertical plug orientation
• 20 A (plug)
• without screw connection

Version ..-401
• 5 x 6,3 mm
• with screw connection
• inclined plug orientation
• 17,5 A (screw); 20 A (plug)

Version ..-402
• 5 x 6,3 mm
• inclined plug orientation
• 20 A (plug)
• without screw connection

WECO’s robust flat plug solutions are specially designed for environments in which high currents and voltages are used and potentials need to be distributed to several locations.

Variable pole configuration and a fixed pole designation on the side of the housing mean that the distribution strips can be configured individually according to customer requirements. They can therefore be supplied flexibly for the respective application.

The series is supplemented by further variants made of a glass fiber reinforced housing material, which, in addition to higher temperature stability, also meets the glow wire test according to the household appliance standard.

The use of a bridge also offers the option of doubling the connections per phase.

Insulation is also possible with a higher mating density and a 60 degree mating angle thanks to a high insulation wall.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • PataBid Raises $2 Million Pre-Seed Round to Modernize Construction Estimating with AI

    PataBid Raises $2 Million Pre-Seed Round to Modernize Construction Estimating with AI

    October 19, 2026 Calgary-based PataBid has raised $2 million in pre-seed funding to transform how contractors estimate complex subtrade construction projects. Led by Graphite Ventures, with participation from Sprout Fund, Bluesky Equities, Inverted Ventures and previous angel investors, the round will deepen PataBid’s AI product development capabilities, expand its supplier partnerships and distribution channels, and… Read More…

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…