Toronto Hydro Leading Ontario in Conservation and Demand Management

Toronto Hydro

Toronto Hydro’s conservation efforts have contributed 22% of the demand savings and 24% of the energy savings of the province’s overall conservation and demand management (CDM) target. These results make Toronto Hydro the largest contributor to 2011-2014 provincial targets. The company was also significant contributor to the Green Energy Act goal to phase out coal generation by 2014.

Since 2005, Toronto Hydro has consistently demonstrated leadership in CDM, working closely with industry partners and stakeholders, including the Ministry of Environment, Independent Electricity System Operator, Ontario Energy Board, City of Toronto, and local electricity and gas distributors. Over the past 10 years, Toronto Hydro has been a leader in the development of innovative local and provincial CDM programs for all market sectors – low income, residential, commercial and industrial.

Here’s what the demand and energy savings mean:

• Toronto Hydro’s 2011-2014 CDM achievements reduced 206 MW of summer peak demand and reduced 1,583 GWh of energy consumption.

• Toronto Hydro’s incremental results are equivalent to:

◦ Powering a city with a population of 150,000

◦ Reducing 45,600 Tonnes of GHG

◦ Removing 16,800 cars from our congested highways

◦ Deferring the need to build infrastructure to power over 300 new condominiums in Toronto (based on average Toronto condo size of 193 units)

• From 2011 to 2014, Toronto Hydro customers who participated in CDM programs received more than $66.5 million in incentives.

• Through outreach, Toronto Hydro helped businesses in Toronto invest $281M equating to approximately $746M in economic spin-off benefits to other businesses.

Learn more about Toronto Hydro’s CDM programs at torontohydro.com/conservation

 

 

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…