NB Power Seeks Community Input on Future of Mactaquac Generating Station

NB Power Seeks Community Input on Future of Mactaquac Generating Station

A series of community-based dialogue sessions in May about the future of Mactaquac Generating Station are the next step in a public discussion launched last fall with two draft reports, open houses and an online survey.

“We understand that any course of action regarding Mactaquac has deep and far-reaching consequences for all New Brunswickers,” says NB Power President and CEO Gaëtan Thomas. “We have been overwhelmed by the generosity of New Brunswickers and others who have shared their stories, insights and concerns about this project. Your feedback is an essential part of the process and will inform our recommendation later this year.”

The Mactaquac Generating Station is expected to reach the end of its service life by 2030, because of expansion problems with its concrete structures. NB Power has identified three possible end-of-life options:

  • build a new generating station
  • remove all structures to allow the river to return to a natural flow
  • leave the dam in place but without power generation

Since 2014, scientists, engineers and other experts have been studying the potential impacts of the three end-of-life options on people and the environment, including First Nations. NB Power also continues to examine the potential for solutions to the concrete problem that may extend the life of the station beyond 2030. NB Power will recommend a future path for the station in 2016.

Mactaquac Generating Station is a 670 megawatt run-of-the-river hydro generating station on the Saint John River in Mactaquac, about 19 km west of Fredericton. The station was commissioned in 1968 with three turbine-generating units, and provides renewable electricity. An additional three turbines were brought into service in 1972, 1979 and 1980.

The May dialogue sessions are scheduled for

  • Fredericton on May 17
  • Mactaquac on May 18
  • Woodstock on May 19

Find out more: https://www.nbpower.com/en/about-us/news-media-centre/news/2016/mactaquac-conversation-continues-with-discussion-paper-community-sessions/.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…