Summerside, PEI: North America’s Leader in Wind Integration

Summerside, PEI: North America’s Leader in Wind Integration

July 29, 2016

Adding a smart grid to store energy has enabled the community of Summerside, PEI to draw 46% of its energy needs from wind power, reports the Huffington Post.

Less than a decade ago, write journalists David Dodge and Dylan Thompson, Summerside was running diesel generators 24/7 to meet the demand for power. To reduce its reliance on diesel power, Summerside built its own 12-megawatt wind farm and contracted 9 more megawatts of wind power from another PEI source.

To ensure a steady supply of power, the community introduced a “Heat for Less Now” program, which uses special furnaces and water heaters in 30% of local homes and businesses to store energy as heat. The appliances are connected to Summerside’s smart grid, and store energy when wind generates more energy than the city needs.

Homeowners who purchase these energy-storing appliances pay five cents less per kilowatt hour than the market rate for electricity, for five years. With a population of 15,000, Summerside runs the program with only 314 energy-storing appliances connected to the grid.

The electric thermal storage home furnaces use electric-powered heat pumps that operate with between 150 and 300% efficiency to produce heat for the home. The units also produce extra heat when the wind is blowing and store that heat in ceramic bricks for later use.

The heaters can store energy as heat for up to three days, allowing Summerside to use its smart grid to run the heaters when the wind is blowing, saving that heat for use by the homeowner when it’s needed. The water heaters are super insulated, allowing water to be heated to 77 degrees C under the control of Summerside’s smart grid. The water heaters lose only one-quarter of a degree per hour and have mixing valves on top to mix the super hot water with cold water to ensure the home gets hot water that’s not too hot to use, about 60 degrees C.

Read the entire article: http://www.huffingtonpost.ca/david-dodge/summerside-pei-wind-power_b_11117360.html.

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…

  • Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    September 16, 2026 This recall involves Goal Zero YETI 3000X power stations. The silver and black portable power stations measure about 62 centimetres (24.4 inches) high, 47 centimetres (18.5 inches) wide, 57 centimetres (22.3 inches) deep and weigh approximately 42 kilograms (92 pounds). The power stations have yellow handles and a digital display at the… Read More…


Changing Scene

  • Innovair Solutions Acquires TRM Heating Cables

    Innovair Solutions Acquires TRM Heating Cables

    September 18, 2026 Innovair Solutions has announced the acquisition of TRM Heating Cables, a Toronto-based Canadian company specializing in heating cables for commercial and industrial applications. Founded in 2001, TRM has built strong technical expertise in the sale and installation of specialized products, including self-regulating cables, mineral-insulated cables and electric floor heating systems. The company… Read More…

  • Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    September 17, 2026 From preparing the next generation of skilled workers to supporting one of the world’s largest sporting events, this year’s recipients demonstrate how electrical safety supports Ontario’s future As Ontario electrifies homes, transportation and industry, the Electrical Safety Authority (ESA) has recognized the organizations and individuals helping ensure safety keeps pace with that… Read More…

  • NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    September 17, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $100 million loan with Morguard Corporation to enable energy‑efficient retrofits across a portfolio of approximately 30 properties in Canada. Morguard is a fully integrated real estate firm with more than $24.2 billion in assets under management across North America. Morguard will collaborate… Read More…

  • Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    September 16, 2026 New Canadian-led infrastructure project will help build secure and reliable computing capacity responsibly On September 14, 2026, the Government of Canada welcomed Bell Canada’s planned investment to expand its Bell AI Fabric capacity in Saskatchewan, an important step toward building the sovereign computing capacity Canada needs to compete and succeed in the… Read More…