Alberta to Support 5,000 MW of Additional Renewable Energy Capacity

Alberta to Support 5,000 MW of Additional Renewable Energy Capacity

September 23, 2016

To achieve its goal of having 30% of electricity used in Alberta come from wind, hydro and solar sources by 2030, the province expects to support 5,000 megawatts of additional capacity at a cost of $10.5 billion or more.

“Growing our renewables sector is a transformational opportunity for Alberta to become a more energy-efficient, lower-carbon province,” says Shannon Phillips, Minister of Environment and Parks and Minister Responsible for the Climate Change Office. “These targets provide clarity for Albertans… and will help us reduce greenhouse gas emissions and grow our economy.”

The minimum $10.5 billion in new investment will mean at least 7,200 new jobs as projects are built. Through the Renewable Electricity Program, the province will solicit enough investment in Alberta’s electricity system to meet the target, while ensuring projects come online in a way that does not impact grid reliability and is cost-effective. The program will be run by the Alberta Electric System Operator (AESO).

To be eligible for support within the Renewable Electricity Program, projects must

• be based in Alberta

• be new or expanded

• be five megawatts or greater in size

• meet the Natural Resources Canada definition of renewable sources

Further details on how the program will operate will be released later this year.

The program will be based on recommendations provided to government by the Alberta Electric System Operator. The operator completed stakeholder consultations earlier this year to help inform its recommendations to government.

The province is now working with AESO on detailed program design and remains on target to release details of the program in the coming months. Work is also underway to improve Alberta’s rules around smaller-scale electricity generation, including micro-generation.

The province is engaging expert stakeholders on ways to make it easier for individual Albertans and communities to create their own renewable energy. Alberta’s Energy Efficiency Advisory Panel, led by Dr. David Wheeler, is also consulting with Albertans as part of the panel’s work to develop recommendations on energy efficiency and small-scale electricity generation programs. These programs will be offered through the newly created Energy Efficiency Alberta organization and will be in place early in 2017.

Image courtesy of dan at FreeDigitalPhotos.net.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…