AddÉnergie to Expand FLO, Its Electric Vehicle Charging Network in Ontario

AddÉnergie to Expand FLO, Its Electric Vehicle Charging Network in Ontario

December 10, 2016

AddÉnergie has announced plans to install 25 fast-charging stations at Canadian Tire Gas+ locations throughout Ontario, with Natural Resources Canada contributing close to 50% of the $1.8-million investment.

The $1.8M program is funded by AddÉnergie, along with a repayable contribution of $837,500 by Natural Resources Canada through its Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative. This financing is part of a $62.5-million federal commitment made in Budget 2016 to fund new fast-charging infrastructure for electric vehicles (EVs) in Canada, as well as natural gas and hydrogen refueling stations along key transportation corridors.

“The support from Natural Resources Canada accelerates our efforts to deliver smart, reliable and safe charging solutions for EV drivers wherever they are — whether it’s at home, at work or on the go,” says AddÉnergie President and CEO Louis Tremblay.

Safe and reliable charging for Canadian EV drivers

The stations will be connected to the FLO charging network, operated by AddÉnergie in several Canadian provinces. FLO is Canada’s most comprehensive and reliable electric charging network, providing EV drivers with more than 2,500 charging stations from coast to coast.

The charging stations will be installed strategically along some of Ontario’s busiest highways to facilitate EV travel in and between cities. Each location will be equipped with a direct-current fast charger (DCFC) and a dual Level 2 curbside charging station to accommodate all types of electric vehicles.

All stations linked to the FLO network are connected and monitored remotely by AddÉnergie’s national operations centre. Free membership in the FLO community comes with a mobile app that allows EV drivers to easily locate available stations and pay for charging sessions.

DCFCs are designed to charge up to 80% of an EV’s capacity in 20-30 minutes, depending on the model. They are compatible with vehicles equipped with CHAdeMO or SAE Combo charging ports, such as the Nissan Leaf, Kia Soul EV, BMW i3 or Tesla Model S (adapter required). Dual Level 2 curbside charging stations will charge most electric vehicles to their full capacity in 3-4 hours and is compatible with both all-electric vehicles and plug-in hybrid cars. Capable of charging 2 EVs simultaneously, they are equipped with an automatic cable retrieval system to retract cables after each use.

The charging stations for the project are designed and developed by AddÉnergie at its facilities in Québec City, and will be manufactured at its plant in Shawinigan, Québec.

Related Articles


Latest Articles

  • Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    July 30, 2026 Alberta’s building retrofit sector is ready to scale and could generate $5.8 billion in GDP and support 24,000 jobs with $2.5 billion in annual investment — but only if governments, utilities, and industry align on a clear, coordinated strategy. Resilient but Not Ready shows that while Alberta’s retrofit supply chain is adaptable and… Read More…

  • Lighting 101: How to Choose the Right LED Replacement

    Lighting 101: How to Choose the Right LED Replacement

    July 30, 2026 By EB Horsman & Son Not all LED replacements are created equal. Whether you’re replacing a single light fixture in your home or upgrading lighting throughout your building, choosing an equivalent LED replacement isn’t always as simple as matching the wattage or colour temperature. Many homeowners, contractors, facility managers, and property managers… Read More…

  • Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    July 30, 2026 By CSC LED When planning an industrial facility, lighting is often discussed by fixture type—high bays, wall packs, flood lights, emergency lighting, and so on. In reality, successful lighting design starts by understanding how each space is used. Every area of an industrial property has different visual requirements. A parking lot prioritizes… Read More…

  • Gescan Milwaukee Tent Events

    Gescan Milwaukee Tent Events

    July 30, 2026 Take advantage of exclusive event‑day pricing, live hands‑on demos with Milwaukee Specialists, and explore new and featured solutions across power tools, lighting, safety, batteries, and accessories. Enjoy food, giveaways, and prize draws happening at the branch for ONE DAY ONLY! BONUS ITEMS: Visit one of Gescan’s participating locations starting at 7:00 am, don’t… Read More…


Changing Scene

  • Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    July 30, 2026 Copper theft continues to rise across Canada, with serious consequences for communities and the critical services they rely on. In the first half of 2026, Bell has seen a surge in theft and vandalism targeting telecommunications infrastructure, causing service outages that can disrupt Internet, TV and phone services — and, most importantly,… Read More…

  • Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    July 30, 2026 Electrozad, a Sonepar company, is proud to announce the launch of its newly enhanced eCommerce website and new mobile app, marking a significant milestone in the Electrozad’s digital evolution and commitment to delivering the best customer experience. The digital platforms are now available to customers across Southwestern Ontario, making it easier and… Read More…

  • Seacliff Electric Introduce New Regional Manager for Calgary Operations

    Seacliff Electric Introduce New Regional Manager for Calgary Operations

    July 20, 2026 Seacliff Electric are pleased to announce that Joe Niosi has accepted the position of Regional Manager for their Calgary operations. “Joe has been an important member of our team and brings extensive experience in the electrical construction industry, project execution, leadership, and team development. Through his time as our Service & Special… Read More…

  • Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    July 20, 2026 New sentencing provisions recognize serious public safety consequences of crimes targeting electrical infrastructure. The Electrical Safety Authority (ESA) welcomes the federal government’s implementation of provisions within the Bail and Sentencing Reform Act (Bill C-14) that strengthen consequences for crimes that damage or interfere with essential infrastructure, including copper theft. Copper theft is a growing challenge… Read More…