Hydrostor and NRStor to Develop Advanced Compressed Air Energy Storage Projects

Hydrostor and NRStor to Develop Advanced Compressed Air Energy Storage Projects

March 29, 2017

Hydrostor Inc., a provider of advanced adiabatic compressed air energy storage (A-CAES) and NRStor Inc., an energy storage project developer, are partnering to develop utility-scale energy storage projects across Canada.

The companies will build on their experience delivering an A-CAES solution for Ontario’s Independent Electricity System Operator (IESO), due to come online in 2018. As Hydrostor’s preferred development partner in Canada, NRStor will accelerate deployment of Hydrostor’s proprietary adiabatic (emission free) solution, one of the lowest cost, bulk-energy storage technologies available.

“Canada needs clean energy storage to efficiently operate the modern electric grid,” says Annette Verschuren, NRStor founder, Chair and CEO. “We are two Canadian companies partnering to deliver just that.”

Hydrostor’s technology can be used to replace fossil fuel “peaker” plants, alleviate transmission congestion and the need for new, costly transmission lines, as well as displace diesel generation in micro-grids.

“Working together, our teams will dramatically accelerate the deployment of Hydrostor’s Advanced Compressed Air Energy Storage across Canada,” says Curtis VanWalleghem, President and CEO of Hydrostor.

The partnership comes on the heels of other recent announcements from Hydrostor and NRStor, including Hydrostor’s global partnership with leading EPC provider AECOM, and NRStor’s equity investment from the Labourers’ Pension Fund of Central and Eastern Canada (LiUNA) and Fengate Real Asset Investments.

NRStor Inc. is a privately held Toronto-based energy storage project developer focused on developing, owning and operating industry-leading energy storage projects in partnership with progressive stakeholders and leading technology providers.

Hydrostor Inc. is a leading provider of advanced adiabatic compressed air energy storage, deployed using its proprietary underground or underwater air accumulator systems, or using underground geological formations. The technology at scale is one of the lowest cost energy storage solutions available on the market today, is emission free, and has an unlimited cycle life for over 25 years.

Hydrostor owns and operates the world’s first adiabatic, underwater-CAES plant with utility host Toronto Hydro, located on Toronto Island. Read more about this project: www.electricalindustry.ca/changing-scenes/1785-world-s-first-utility-scale-underwater-compressed-air-energy-storage-system-activated-in-lake-ontario.

Related Articles


Latest Articles

  • Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    July 30, 2026 Alberta’s building retrofit sector is ready to scale and could generate $5.8 billion in GDP and support 24,000 jobs with $2.5 billion in annual investment — but only if governments, utilities, and industry align on a clear, coordinated strategy. Resilient but Not Ready shows that while Alberta’s retrofit supply chain is adaptable and… Read More…

  • Lighting 101: How to Choose the Right LED Replacement

    Lighting 101: How to Choose the Right LED Replacement

    July 30, 2026 By EB Horsman & Son Not all LED replacements are created equal. Whether you’re replacing a single light fixture in your home or upgrading lighting throughout your building, choosing an equivalent LED replacement isn’t always as simple as matching the wattage or colour temperature. Many homeowners, contractors, facility managers, and property managers… Read More…

  • Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    July 30, 2026 By CSC LED When planning an industrial facility, lighting is often discussed by fixture type—high bays, wall packs, flood lights, emergency lighting, and so on. In reality, successful lighting design starts by understanding how each space is used. Every area of an industrial property has different visual requirements. A parking lot prioritizes… Read More…

  • Gescan Milwaukee Tent Events

    Gescan Milwaukee Tent Events

    July 30, 2026 Take advantage of exclusive event‑day pricing, live hands‑on demos with Milwaukee Specialists, and explore new and featured solutions across power tools, lighting, safety, batteries, and accessories. Enjoy food, giveaways, and prize draws happening at the branch for ONE DAY ONLY! BONUS ITEMS: Visit one of Gescan’s participating locations starting at 7:00 am, don’t… Read More…


Changing Scene

  • Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    July 30, 2026 Copper theft continues to rise across Canada, with serious consequences for communities and the critical services they rely on. In the first half of 2026, Bell has seen a surge in theft and vandalism targeting telecommunications infrastructure, causing service outages that can disrupt Internet, TV and phone services — and, most importantly,… Read More…

  • Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    July 30, 2026 Electrozad, a Sonepar company, is proud to announce the launch of its newly enhanced eCommerce website and new mobile app, marking a significant milestone in the Electrozad’s digital evolution and commitment to delivering the best customer experience. The digital platforms are now available to customers across Southwestern Ontario, making it easier and… Read More…

  • Seacliff Electric Introduce New Regional Manager for Calgary Operations

    Seacliff Electric Introduce New Regional Manager for Calgary Operations

    July 20, 2026 Seacliff Electric are pleased to announce that Joe Niosi has accepted the position of Regional Manager for their Calgary operations. “Joe has been an important member of our team and brings extensive experience in the electrical construction industry, project execution, leadership, and team development. Through his time as our Service & Special… Read More…

  • Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    July 20, 2026 New sentencing provisions recognize serious public safety consequences of crimes targeting electrical infrastructure. The Electrical Safety Authority (ESA) welcomes the federal government’s implementation of provisions within the Bail and Sentencing Reform Act (Bill C-14) that strengthen consequences for crimes that damage or interfere with essential infrastructure, including copper theft. Copper theft is a growing challenge… Read More…