Alerton Ascent Control Module Global Controller

Ascent Control Module

The Ascent Control Module replaces the current BCM array–and the Alerton Integration Engine (AIE)–by providing a powerful assortment of features, such as multiple global controller instances, and multiple communication networks. The ACM is ideal for retrofit applications, new construction jobs, projects where BACnet is built-in, and installations where integration protocols are used. Simply put, the ACM is one of the most powerful and versatile controllers on the market.

 

Features:

 

  • Offers the power of NiagaraAX® on a native Alerton device to provide twice the programming options to fit virtually any project
  • Quad-core processor for faster computing power, communication, and control
  • Backwards compatibility allows owners to update the look of their building without large capital expenses
  • 6 global controller instances and 6 MS/TP trunks; one device exceeds the functionality of 6 individual devices
  • Thousands of alarms, schedules and trend logs​
  • Option cards offer scalability for additional communication trunks as needed

For more information:

 

http://alerton.com/en-US/products/BACnet/ACM/Pages/default.aspx

Related Articles


Latest Articles

  • Open Letter: Specifying Electrical Conduit for Critical Facilities

    Open Letter: Specifying Electrical Conduit for Critical Facilities

    June 5, 2026 Dear Industry Professionals, When specifying electrical conduit for critical facilities, such as hospitals and data centers, the finish on your raceway system is just as crucial as its structural integrity. Many non-domestic steel products use electroplated zinc coatings that harbor a hidden, expensive liability: zinc whiskers. These microscopic, electrically conductive metallic filaments Read More…

  • Engagement Begins on Prompt-Payment Legislation in BC

    Engagement Begins on Prompt-Payment Legislation in BC

    June 1, 2026 Engagement is now open to support the implementation of the new Construction Prompt Payment Act, which is designed to ensure fair, on-time payment for contractors and subcontractors. Engagement is taking place through the B.C. Construction Prompt Payment Act discussion paper. This paper has been distributed to partners in the construction industry to collect Read More…

  • Why New Pool and Hot Tub Code Changes Matter More Than Ever

    Why New Pool and Hot Tub Code Changes Matter More Than Ever

    June 1, 2026 As an electrical contractor, pools and hot tubs aren’t just another install. They’re high-liability environments where small oversights can turn into serious safety issues. And those risks aren’t theoretical. “We are seeing reports of shocks at hot tubs,” says ESA Technical Advisor Trevor Tremblay. “We had one example of people just relaxing Read More…

  • How Do I Choose the Right Conductor Material for Cables and Wires?

    How Do I Choose the Right Conductor Material for Cables and Wires?

    May 29, 2026 By Christian Dettmer, Head of Technical Department – HELU The conductor material is the heart of a cable or wire. It forms the core and ensures efficient transmission of energy, signals, or data. Depending on the area of application, the right choice is crucial for the reliability, service life, and performance of Read More…


Changing Scene