City of Brampton approves the Purchase of 10 Electric Buses

Brampton

September 27, 2017

Brampton City Council has given the city’s transit authority the green light to purchase up to 10 battery-electric buses and four high-powered overhead electric charging stations as part of a multimillion dollar trial run aimed at lowering carbon emissions and fuel costs.

The $13.6 million capital project is part of the Pan-Ontario Electric Bus Demonstration and Integration Trial, “a unique partnership model” made up of multiple levels of government, bus manufacturers and other stakeholders, including the Canadian Urban Transit Research and Innovation Consortium (CUTRIC). Automation firms ABB and Siemens will build the charging stations.

 

The new 100 per cent battery electric buses will be launched on two existing conventional routes in Brampton, routes 23 Sandalwood and 26 Mount Pleasant, with new overhead charging stations at the Mount Pleasant Village terminal, the Queen Street/ Highway 50 Züm station, and the Sandalwood Transit Facility. 

New Flyer Industries and NOVA Bus will supply the buses, which could hit Brampton’s streets as early as spring 2018. Other levels of government are expected to offset some of the costs, according to a staff report.

“As a fast-growing Canadian city undergoing major urban intensification, Brampton’s public transit users expect and deserve leading-edge technology and superior services,” said Mayor Linda Jeffrey, stressing a need for transit solutions that are “environmentally friendly and help move our people more efficiently.”

Josipa Petrunic, CUTRIC executive director and CEO, said the pilot effort will show “the world Canada is a leader in driving down emissions, improving transportation, and creating greener, cleaner and more mobile communities.”

Brampton Transit currently operates a fleet of 407 buses, including conventional diesel and 99 diesel-electric hybrid Züm buses.

Transit staff said the electric bus trial would allow the city to compare efficiencies, maintenance costs “and validate electric vehicle technology as a viable alternative fuel source”. 

Brampton Transit spent $10.8 million on diesel fuel last year. Under the Province’s new cap-and-trade system, fuel costs in 2017 are expected to increase by an estimated $570,000 annually (anticipated carbon pricing will increase diesel fuel cost by an estimated four to five per cent).

Another benefit is reduced maintenance cost. Maintenance on electric buses is estimated to be 50 per cent less than conventional diesel buses, said staff.

Electric buses take approximately three to five minutes to fully charge using smart-grid technology.

Staff will report back to council with an update on the status of the trial following the conclusion of Phase 1. 

https://www.bramptonguardian.com/news-story/7185321-electric-buses-to-hit-brampton-roads-by-2018/

Related Articles


Latest Articles

  • Bussmann™ Series Toolbox Resource Library

    Bussmann™ Series Toolbox Resource Library

    November 25, 2024 Bussmann™ Series Toolbox is an extensive library of resources for anyone who wants to advance their knowledge of electrical safety, circuit protection technology and Code compliance. It’s also handy for those who work with or sell Bussmann Series fuses. The landing page provides the efficiency and organization of one portal for all… Read More…

  • TSBC Fee Changes in Effect January 1, 2025

    TSBC Fee Changes in Effect January 1, 2025

    November 25, 2024 After consulting with industry partners, TSBC have released a new fee schedule that reflects fees for 2024-2025. “Over the past few years, we have done everything possible to keep increases to a minimum for our clients, including closing offices, reducing operating budgets, and eliminating multiple roles at Technical Safety BC,” reads TSBC’s website…. Read More…

  • Grounded in Ontario: Exploring a Career as an ESA Inspector

    Grounded in Ontario: Exploring a Career as an ESA Inspector

    November 18, 2024 Technical Advisor Diana Madill shares her inspiring career journey from electrician to inspector and how she overcame challenges as a woman in the trade. If you’ve ever wondered about becoming an Electrical Safety Authority (ESA) inspector, Diana Madill has a path she encourages you to follow. From her humble beginnings inspired by… Read More…

  • Quebec Region YPN Welcomed Three Industry Leaders to Discuss the Future of the Industry

    Quebec Region YPN Welcomed Three Industry Leaders to Discuss the Future of the Industry

    November 18, 2024 On November 7th, the YPN Quebec Region hosted its last 2024 event, the YPN Panel discussion. The panel discussion was moderated by Marcos Simard of Wesco, President of the Quebec YPN Committee. Three leaders from the electrical industry, Gilles Motard, VP operation, Lumen, Corinne Galarneau, company VP, Agence Ricard, Stéphanie Santini, VP… Read More…


Changing Scene

  • Bartle & Gibson Announces Partnership with Electric Avenue

    Bartle & Gibson Announces Partnership with Electric Avenue

    November 25, 2024 Bartle & Gibson Co. Ltd., a Western Canada-based premier plumbing, heating and electrical distributor, proudly announced a new regional partnership to distribute Electric Avenue, providers of convenient, affordable and easy-to-use smart charging solutions for residential and commercial use, across Western Canada. Electric Avenue was founded in 2021 with one simple mission: to… Read More…

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…