New Brunswick Power Commissions Fast-Charging Station in Moncton

NB Power

November 9, 2017

NB Power has announced the completion of the first phase of the fast-charging infrastructure along the TransCanada highway with commissioning of a fast-charging station in Moncton at the Magnetic Hill Irving. Electric vehicles (EV) can now charge up in the parking lot at 2731 Mountain Road in Moncton at a fast-charging or standard level-2 station.

“NB Power is proud to ‘lead the charge’ in establishing infrastructure needed to support the adoption of electric vehicles in New Brunswick,” said Keith Cronkhite, senior vice-president of business development and strategic planning at NB Power. “Using the NB Power eCharge Network’s charging stations for electric vehicles, New Brunswickers can save significantly on fuel costs and lessen their impact on the environment.”

“We’re thrilled to work with NB Power to offer a new energy option for our customers at the Magnetic Hill Irving,” said Jason Lutes, owner of the Magnetic Hill Irving. “Electric vehicle drivers can now stop here to recharge while enjoying our service station’s amenities.”

“This electric vehicle network provides New Brunswickers the confidence and convenience they need to make cleaner choices the next time they buy a vehicle,” said the Honourable Ginette Petitpas Taylor, Member of Parliament for Moncton — Riverview — Dieppe, on behalf of the Honourable Jim Carr, Canada’s Minister of Natural Resources. “The Government of Canada continues to support green infrastructure in the transportation sector that will advance Canada’s efforts to build a clean economy, create well-paying jobs, and achieve our climate change goals.”

The Magnetic Hill Irving is the tenth fast-charging site along the Trans-Canada Highway, completing the first phase of fast-charging infrastructure roll-out.

About the eCharge Network:

The eCharge Network is NB Power’s public charging program for plug-in electric vehicles. The eCharge Network is made up of 19 standard level-2 (240 Volt) and 10 fast (400 Volt) charging stations located throughout the province. The network aims to enable drivers of electric vehicles to travel around New Brunswick.

Electric vehicle drivers can sign up to the eCharge Network online and download the eCharge Network app for iOS and Android to locate charging stations, add credits to their account and access charging stations. The eCharge Network is interoperable with the Electric Circuit in Québec and the FLO network’s thousands of stations throughout Canada.

Quick facts:

  • There are currently 19 standard level-2 eCharge Network stations available for use in the following municipalities: Edmundston, St. André, Perth-Andover, Prince William, Woodstock, Fredericton, Waasis, Youngs Cove, Salisbury, Quispamsis, Bathurst, Moncton, Shediac, Aulac, and Grand Bay-Westfield.
  • There are currently 10 fast-charging stations available for use in the following locations: Edmundston, St. André, Perth-Andover, Woodstock, Prince William, Waasis, Youngs Cove, Salisbury, Moncton and Aulac.
  • It takes several hours to recharge completely at a standard level-2 charging station.
  • Both plug-in hybrid and all-electric vehicles can charge at a 120-volt outlet or standard level-2 charging stations (240 volt).
  • An all-electric vehicle can recharge up to 80 per cent in as little as 30 minutes at a fast charging (“level 3” / 400 volt) station.

Related Articles


Latest Articles

  • Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    July 30, 2026 Alberta’s building retrofit sector is ready to scale and could generate $5.8 billion in GDP and support 24,000 jobs with $2.5 billion in annual investment — but only if governments, utilities, and industry align on a clear, coordinated strategy. Resilient but Not Ready shows that while Alberta’s retrofit supply chain is adaptable and… Read More…

  • Lighting 101: How to Choose the Right LED Replacement

    Lighting 101: How to Choose the Right LED Replacement

    July 30, 2026 By EB Horsman & Son Not all LED replacements are created equal. Whether you’re replacing a single light fixture in your home or upgrading lighting throughout your building, choosing an equivalent LED replacement isn’t always as simple as matching the wattage or colour temperature. Many homeowners, contractors, facility managers, and property managers… Read More…

  • Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    July 30, 2026 By CSC LED When planning an industrial facility, lighting is often discussed by fixture type—high bays, wall packs, flood lights, emergency lighting, and so on. In reality, successful lighting design starts by understanding how each space is used. Every area of an industrial property has different visual requirements. A parking lot prioritizes… Read More…

  • Gescan Milwaukee Tent Events

    Gescan Milwaukee Tent Events

    July 30, 2026 Take advantage of exclusive event‑day pricing, live hands‑on demos with Milwaukee Specialists, and explore new and featured solutions across power tools, lighting, safety, batteries, and accessories. Enjoy food, giveaways, and prize draws happening at the branch for ONE DAY ONLY! BONUS ITEMS: Visit one of Gescan’s participating locations starting at 7:00 am, don’t… Read More…


Changing Scene

  • Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    July 30, 2026 Copper theft continues to rise across Canada, with serious consequences for communities and the critical services they rely on. In the first half of 2026, Bell has seen a surge in theft and vandalism targeting telecommunications infrastructure, causing service outages that can disrupt Internet, TV and phone services — and, most importantly,… Read More…

  • Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    July 30, 2026 Electrozad, a Sonepar company, is proud to announce the launch of its newly enhanced eCommerce website and new mobile app, marking a significant milestone in the Electrozad’s digital evolution and commitment to delivering the best customer experience. The digital platforms are now available to customers across Southwestern Ontario, making it easier and… Read More…

  • Seacliff Electric Introduce New Regional Manager for Calgary Operations

    Seacliff Electric Introduce New Regional Manager for Calgary Operations

    July 20, 2026 Seacliff Electric are pleased to announce that Joe Niosi has accepted the position of Regional Manager for their Calgary operations. “Joe has been an important member of our team and brings extensive experience in the electrical construction industry, project execution, leadership, and team development. Through his time as our Service & Special… Read More…

  • Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    July 20, 2026 New sentencing provisions recognize serious public safety consequences of crimes targeting electrical infrastructure. The Electrical Safety Authority (ESA) welcomes the federal government’s implementation of provisions within the Bail and Sentencing Reform Act (Bill C-14) that strengthen consequences for crimes that damage or interfere with essential infrastructure, including copper theft. Copper theft is a growing challenge… Read More…