Siemens Gamesa Reinforces its Position in the Canadian Renewable Market

EIN Gamesa Suncor 400

Feb 20, 2020

Siemens Gamesa Renewable Energy is reinforcing its position in the Canadian market with a contract to supply 45 SG 4.5-145 wind turbines, with flexible rating, to Suncor for the company’s Forty Mile wind power project in southern Alberta. The order, signed in December 2019, is for a nominal capacity of 205 MW and includes a maintenance agreement for 20 years.

Since 2008, Siemens Gamesa has been providing cost-effective and clean energy to Canadians across OntarioQuebecManitobaAlberta, and Saskatchewan. From its first 2.3 MW wind turbine to the newer SG 4.5-145 turbine, Siemens Gamesa’s product portfolio has served the Canadian market with customized solutions for the unique wind conditions of each project. This agreement takes the total suite of projects for the 45 SG 4.5-145 wind turbine model in Canada to 574 MW, demonstrating its competitiveness and suitability for the market.

“We are happy to strengthen our relationship with Suncor,” said David Hickey, head of the Siemens Gamesa business in Canada. “The SG 4.5-145 turbines provide extremely cost competitive and clean energy, bringing economic benefits to the local communities in Alberta.” This is the third order with Suncor, reinforcing the partnership between the two companies.

Once operational in 2021, Suncor’s Forty Mile wind power project will provide green energy for more than 100,000 Alberta homes. The turbine’s 71-meter blade integrates aerodynamics and noise reduction features—including Siemens Gamesa DinoTails Next Generation technology—to guarantee a high production of energy and reduced noise emission levels.

With more than 3,000 MW installed in Canada, Siemens Gamesa Renewable Energy is a market leader by cumulative installed capacity. Our team of employees provide technical expertise, top-tier service, quality products, and ongoing support to all of our customers.

Source

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 By William (Bill) Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric had been teasing a major announcement on their social media recently, before finally announcing last week they have rebranded as Bernie’s Electric Supplies Ltd, a nod to the company’s founder and legacy. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…