STANDATA Interpretation 2021 CE Code, Section 12 -Installation of Boxes, Cabinets, Outlets, and Terminal Fitings

Janaury 22, 2024

Industry has requested clarification/interpretation on the phrase “equivalent device” as described in CE Code, Part I Rule 123000 1) and how it relates to conduit fittings.

Interpretation

The term “equivalent device” in rule 12-3000 1) includes “conduit fittings” in special applications (i.e., connection to solenoids, photocells, etc.). Wire leads from these devices must be integral to the device. Where the device has a bonding conductor and the conduit fitting has no provisions for attaching a bonding conductor, a separate bonding conductor must be provided in the conduit system to the fitting. The fitting must also comply with the requirements of Rule 12-3034 maximum number of insulated conductors in a box and Table 22 regarding the volume limitations.

This INTERPRETATION is applicable throughout the Province of Alberta.

View the full STANDATA HERE

Code References C22.1:21 – 2021 Canadian Electrical Code, Part I

12-3000 Outlet boxes (see Appendix B)

1) A box or an equivalent device shall be installed at every point of outlet, switch, or junction of conduit, raceways, armoured cable, or non-metallic-sheathed cable.

12-3034 Maximum number of insulated conductors in a box (see Appendix B)

1) Boxes shall be of sufficient size to provide usable space for all insulated conductors contained in the box, subject to the following:

a) an insulated conductor running through a box with no connection therein shall be considered as one insulated conductor;

b) each insulated conductor entering or leaving a box and connected to a terminal or connector within the box shall be considered as one insulated conductor;

c) an insulated conductor of which no part leaves the box shall not be counted; and

d) No. 18 and No. 16 AWG fixture-wires supplying a luminaire mounted on the box containing the fixture-wires shall not be counted.

Δ 2) Except as specified in Subrule 3) and subject to the details given in Subrule 1), boxes of the nominal dimensions given in Table 23 shall not contain more insulated conductors of a given size than permitted by the Table, and the number of conductors shall be reduced for each of the following conditions as applicable:

a) one insulated conductor, of the largest size in the box, for each fixture stud or hickey within the box;

b) one insulated conductor, of the largest size terminated under the conductor connector, for every pair of conductor connectors with insulating caps; and

c) two insulated conductors for each flush-mounted device on a single strap within the box.

3) Where a box contains a device having a dimension greater than 2.54 cm between the mounting strap and the back of the device, the total usable space shall be reduced by the space occupied by the device, calculated as 32 cm3 multiplied by the depth of the device in centimetres.

4) Subject to the details given in Subrules 1) and 3), boxes having nominal dimensions or volume other than those shown in Table 23, or any box containing insulated conductors of different sizes, shall have the amount of usable space per insulated conductor as specified in Table 22, but the number of insulated conductors so calculated shall be reduced for each of the conditions of Subrule 2) as applicable with the exception of Subrule 2 b), provided that such exception is based on the size of the largest insulated conductor that is included with every pair of conductor connectors.

5) The total usable space in a box considered under Table 22 shall be considered to be the internal volume of the box and shall disregard any space occupied by locknuts, bushings, box connectors, or clamps.

6) Where sectional boxes are ganged, or where plaster rings, extension rings, or raised covers are used in conjunction with boxes, ganged or otherwise, and are marked with their volume measurement, the space in the box shall be the total volume of the assembled sections.

Go HERE for more information on all STANDATA publications

Related Articles


Latest Articles


Changing Scene

  • Mac’s II Agencies Announce Addition to Project & Specification Sales Team

    Mac’s II Agencies Announce Addition to Project & Specification Sales Team

    July 10, 2025 Mac’s II Agencies is pleased to announce that Drazen Jerkovic will be joining their Project & Specification Sales team in the Lighting Division later this fall. With over 25 years of experience in the lighting and electrical industry, Drazen is a highly respected consultant known for his technical knowledge and deep understanding of project delivery…. Read More…

  • Intralec Named New Sales Agency Partner for IDEAL Electrical in Central & Southwestern Ontario

    Intralec Named New Sales Agency Partner for IDEAL Electrical in Central & Southwestern Ontario

    July 7, 2025 Intralec Electrical Products is proud to announce our new partnership with IDEAL Electrical as their sales agency for the Central & Southwestern Ontario regions. As a Canadian manufacturer with over 60 years of experience producing quality products—many of which, like the Can-Twist wire connector and Yellow 77 lubricant, are made in Ajax,… Read More…

  • City of Winnipeg Continues to Improve Online Permits System

    City of Winnipeg Continues to Improve Online Permits System

    July 4, 2025 The City of Winnipeg has launched an improved Permits Online web portal. This upgrade aims to make the permit process more convenient for customers. Permits Online is a one-stop shop to manage the permit process. Now, the web portal is easier to use because customers can navigate it using their mobile device. The portal… Read More…

  • Schneider Electric Launches Chapter 3 of Sustainability School

    Schneider Electric Launches Chapter 3 of Sustainability School

    July 4, 2025 Schneider Electric, the leader in the digital transformation of energy management and automation, has launched Chapter 3 of its online Sustainability School, a free training program designed to empower its channel ecosystem partners to become leaders in sustainability. This chapter will focus on teaching businesses how to decarbonize and unlock the competitive… Read More…