Information Bulletin for Solar Photovoltaic Installations in Winnipeg

April 20, 2026

The following is a guide to solar photovoltaic (PV) installations and permit requirements for wall mounted, roof mounted and ground mounted installations for both housing and commercial applications. This document attempts to address all scenarios however, solar PV system designs and equipment can vary greatly for each installation, so it should not be considered an all-inclusive document.

Building and electrical permit s are required for solar PV installations in the City of Winnipeg. Documents submitted for permits must be clear, legible and good quality.

Development permit information

A development permit confirms the structure is located on the property in accordance with the zoning bylaw and other City department’s requirements.

A development permit is not required for solar photovoltaic installations if the installation is:

  1. located on a building and is mounted 8 feet or greater above grade, or
  2. ground mounted. 

Your building permit application must be accompanied by a Declaration Form for Development Permit Exemption. See winnipeg.ca/developmentpermits.

Building permit information

A building permit confirms the structure meets code requirements. Documents submitted for building permit applications must be sealed by a structural engineer licensed to practice in the Province of Manitoba. They must be accompanied by a completed Required Professional Designer’s Certificate (commercial) (winnipeg.ca/ppd/permits/Commercial/Resources.stm) or a Professional Designer’s Certificate for Housing (winnipeg.ca/ppd/permits/Residential/Resources.stm), as
applicable.

Wall and roof-mounted systems

A building permit is required for all wall and roof-mounted solar PV installations and may be applied for by the licensed installer or homeowner/building owner.

The installation of solar panels will result in additional weights that the existing structure may not have been designed for. Structures are designed for specific loads. When combined with the solar panel and racking system weight, total loads can increase significantly which can compromise the structural integrity of the building. Winnipeg weather is variable resulting in roofs that may be subject to full design wind and snow loads, and therefore a building permit is required for all roof mounted solar PV installations.

An engineering report assessing the existing structure is required under the seal and signature of a structural engineer licensed to practice in the Province of Manitoba. The engineer must certify that the existing structure can safely support all Code required design loads and increased loading due to the addition of the solar PV system, in compliance with the structural requirements of the Manitoba Building Code (MBC). Engineers must consider the structure as a whole in the report and not just the roof. A similar engineering report is required for wall mounted installations.

Related Articles


Latest Articles


Changing Scene

  • Hubbell Canada Forms Strategic Alliance with Mac’s II Agencies to Strengthen Harsh & Hazardous Market Presence in British Columbia

    Hubbell Canada Forms Strategic Alliance with Mac’s II Agencies to Strengthen Harsh & Hazardous Market Presence in British Columbia

    August 17, 2026 Hubbell Canada is pleased to announce a new strategic partnership with Mac’s II Agencies, effective August 1, 2026, to represent Hubbell Canada’s Harsh & Hazardous portfolio throughout British Columbia. This newly formed alliance further strengthens Hubbell Canada’s commitment to serving customers operating in some of the most demanding industrial environments, while supporting… Read More…

  • AEA Scholarships and Bursaries Apply by August 31st

    AEA Scholarships and Bursaries Apply by August 31st

    August 17, 2026 The Alberta Electrical Alliance is proud to support our industry with over $320,500 of postsecondary scholarships for current members and their children. Your participation in AEA events helps fund AEA scholarships and build our industry’s future. AEA Sponsored Scholarships Open to employees, dependents, and children of parents who are members of the… Read More…

  • Contractors’ Corner at the 2026 NETCO Conference

    Contractors’ Corner at the 2026 NETCO Conference

    August 17, 2026 ECAO and CECA look forward to joining industry leaders at the NETCO – National Electrical Trade Council 2026 Conference for an important conversation on AI and its growing role in electrical contracting. R. Graeme Aitken, Executive Director of ECAO, Terry Milot, President of the Canadian Electrical Contractors Association, and Témoc Vega, PhD,… Read More…

  • Cooper Lighting Solutions Earns Eight Selections in 2026 IES Progress Report 

    Cooper Lighting Solutions Earns Eight Selections in 2026 IES Progress Report 

    August 17, 2026 Cooper Lighting Solutions has earned eight selections in the 2026 Illuminating Engineering Society (IES) Progress Report, more than any other lighting manufacturer recognized this year. The achievement marks the company’s 16th year of recognition in the past 18 years. The selected solutions address a broad range of lighting needs, from precise outdoor… Read More…