Tool-Free Terminations Brought to you by Legrand

June 1, 2026

The PowerHold™ receptacle device maximizes contractor productivity, reduces errors, and enhances profitability while delivering faster, more reliable results. With fast terminations, superior wiring retention and color-coded levers that ensure accurate connections, this standard receptacle makes the installation process quick, easy, and safe. Unlike traditional receptacles that require multiple tools and longer termination times, PowerHold allows for rapid terminations in 10 seconds or less.  Best suited for MDU, hospitality, prefab, and commercial applications.

The PowerHold receptacle introduces several innovative design elements that distinguish it from conventional wiring devices:

Tool-Free Terminations Brought to you by Legrand

Fast Terminations.

With terminations in 10 seconds or less, PowerHold  significantly boosts your productivity, enabling you to take on more projects and complete them ahead of schedule.

Easy Wiring.

PowerHold makes the wiring process easier and safer with no exposed live components. Easily-accessed break-off tab on both hot and neutral side for fast and easy split-circuit wiring.

Superior Wire Retention.

With a retention force greater than 30 lbs, PowerHold’s custom wire retainer geometry ensures consistent, reliable connections that are twice as strong as the competition.

Sleek, Space-Saving Design.

Shallower than competitors, PowerHold offers a streamlined design without compromising on performance.

Error-Free Installation.

Color-coded levers (white/neutral, black/hot, green/ground) reduce the risk of miswiring, while an audible snap confirms the lever is securely closed.

Tamper-Resistant.

Dual mechanical shutter system to help prevent insertion of foreign objects.

Built for Tomorrow.

Dependable connections that stay secure during use, yet are easily changeable for future updates or renovations.

Perfect for a Variety of Applications.

Ideal for light commercial, hospitality, commercial office, multi-dwelling units, prefabrication and residential applications.

POWERHOLD VS. CONVENTIONAL

PowerHold: Terminates in 10 seconds or less

Conventional: About a minute

Related Articles


Latest Articles

  • Engagement Begins on Prompt-Payment Legislation in BC

    Engagement Begins on Prompt-Payment Legislation in BC

    June 1, 2026 Engagement is now open to support the implementation of the new Construction Prompt Payment Act, which is designed to ensure fair, on-time payment for contractors and subcontractors. Engagement is taking place through the B.C. Construction Prompt Payment Act discussion paper. This paper has been distributed to partners in the construction industry to collect Read More…

  • Why New Pool and Hot Tub Code Changes Matter More Than Ever

    Why New Pool and Hot Tub Code Changes Matter More Than Ever

    June 1, 2026 As an electrical contractor, pools and hot tubs aren’t just another install. They’re high-liability environments where small oversights can turn into serious safety issues. And those risks aren’t theoretical. “We are seeing reports of shocks at hot tubs,” says ESA Technical Advisor Trevor Tremblay. “We had one example of people just relaxing Read More…

  • How Do I Choose the Right Conductor Material for Cables and Wires?

    How Do I Choose the Right Conductor Material for Cables and Wires?

    May 29, 2026 By Christian Dettmer, Head of Technical Department – HELU The conductor material is the heart of a cable or wire. It forms the core and ensures efficient transmission of energy, signals, or data. Depending on the area of application, the right choice is crucial for the reliability, service life, and performance of Read More…

  • University of Waterloo Students Help Decarbonize ESA’s Ontario-Wide Fleet

    University of Waterloo Students Help Decarbonize ESA’s Ontario-Wide Fleet

    May 29, 2026 By Chantal Vallis, Faculty of Environment – University of Waterloo Reducing a business’ carbon footprint is no small task. For Ontario’s Electrical Safety Authority, which operates province-wide and logs eight to nine million kilometers annually, the challenge is especially complex. Recognizing the scale of the issue, they turned to the next generation Read More…


Changing Scene