Electric Avenue Launches Program Paying Homeowners 13 Cents for Every kWh Charged

September 11, 2026

New electricity rebate gives eligible residential drivers on the Electric Avenue network money back for the energy they charge at home, with enrollment open now for all homeowners.

Electric Avenue Manufacturing Inc. is introducing the Homeowner Rebate Program, a new electricity rebate that will allow eligible residential EV drivers connected to its charging network to benefit from the value generated through Canada’s Clean Fuel Regulations (CFR).

The program will be available to eligible residential charging stations networked to Electric Avenue’s Charging Station Management System (CSMS). This includes Electric Avenue residential charging stations as well as compatible third-party EV charging stations connected to Electric Avenue’s backend through the Open Charge Point Protocol (OCPP).

Through the Homeowner Rebate Program, Electric Avenue will provide an electricity rebate to participating drivers, funded by a portion of the carbon credit value generated by eligible residential charging. The rebate will be $0.13 per kWh charged, a flat rate that applies to all homeowners on the network.

Eligible charging is being tracked retroactively beginning August 1, 2026, with the first payments to be issued in early 2027.

“EV drivers are already helping reduce transportation emissions every time they charge,” said Mark MacDonald, President and Founder of Electric Avenue. “This rebate is one more way we’re lowering the cost of owning an EV, making home charging a little more accessible for homeowners across the country.”

Enrollment in the program is now open to all eligible homeowners. Drivers can enroll directly through the free Electric Avenue app by selecting “Earn 13¢/kWh at Home” from the main menu.

Electric Avenue customers can also view their charging activity and total energy consumption through the app. Beginning this fall, participating homeowners will receive a monthly rebate report by email, which can be cross-referenced with the energy dispensed data visible in the app.

Source

Related Articles


Latest Articles


Changing Scene

  • Electric Avenue Launches Program Paying Homeowners 13 Cents for Every kWh Charged

    Electric Avenue Launches Program Paying Homeowners 13 Cents for Every kWh Charged

    September 11, 2026 New electricity rebate gives eligible residential drivers on the Electric Avenue network money back for the energy they charge at home, with enrollment open now for all homeowners. Electric Avenue Manufacturing Inc. is introducing the Homeowner Rebate Program, a new electricity rebate that will allow eligible residential EV drivers connected to its… Read More…

  • Luminis Wins Four GRANDSPRIX DU DESIGN Awards

    Luminis Wins Four GRANDSPRIX DU DESIGN Awards

    September 11, 2026  Luminis® has announced its Bellevue Slim, Ellington, and Trilo luminaire families have all received GRANDS PRIX DU DESIGN Awards. Bellevue Slim and Trio were awarded GOLD CERTIFICATION in the Product Design – Lighting/Outdoor Lighting Fixture category. Ellington received GOLD CERTIFICATION in both the Lighting/Outdoor and Lighting/Indoor categories. The GRANDS PRIX DU DESIGN… Read More…

  • Location Selected for New Cape Breton Trades Exhibition Centre

    Location Selected for New Cape Breton Trades Exhibition Centre

    September 11, 2026 The Cape Breton Trades Exhibition Centre, a new hub to promote careers in the skilled trades and support construction training in the region, will open in downtown Sydney in 2027. It will provide hands-on learning experiences for students and jobseekers, showcase a wide range of construction trades and offer space for apprenticeship… Read More…

  • Houle Selected as Electrical and Technology Contractor for New BC Cancer Centre

    Houle Selected as Electrical and Technology Contractor for New BC Cancer Centre

    September 11, 2026 Houle proudly announced they have been selected as the electrical and technology contractor for the new BC Cancer centre at Nanaimo Regional General Hospital. Part of BC’s 10-year cancer action plan, this four-storey facility will expand cancer care for patients in Nanaimo and its surrounding communities. When complete in 2028, the centre… Read More…