Valard Construction Selected by Statnett for Construction of the Fjotland-Ertsmyra-Lyse-Duge Transmission Line

Valard Construction

May 18, 2016

Valard Construction announced that it has been selected by Statnett to construct the Fjotland-Ertsmyra-Lyse-Duge Transmission Line. The project is part of Statnett’s larger Vestre korridor or West Corridor Project.

Valard’s scope of work includes the construction of over 100 kilometers (km) of new 420 kilovolt (kV) alternating current (AC) transmission line and the decommissioning of approximately 90 km of existing 300 kilovolt (kV) transmission line. Construction is expected to begin later this year and is expected to be complete at the end of 2021.

“This project is a good fit given Valard’s extensive transmission construction experience as well as with our growth strategy,” said Adam Budzinski, President of Valard Construction. “We appreciate the confidence Statnett has placed in us for this project and look forward to continuing our positive relationship with them and the people of Norway.”

The project consists of over 100 km new 420 kV AC overhead transmission lines:
• Duge – Lyse 17 km
• Lyse – Tjørhom 25 km
• Tjørhom – Ertsmyra 27 km
• Ertsmyra – Fjotland 20 km
• Re-routing Lysebotn and Fjotland 12 km
• New line construction 2016‐2019

Other project details include:
• Decommissioning of approximately 90 km of existing 300 kilovolt (kV) transmission line
• High altitude construction areas
• Significant use of helicopters for construction and decommissioning
• Decommissioning 2019‐2021.

This contract has been awarded after being approved by Statnett’s Board of Directors.

 

 

Related Articles


Latest Articles


Changing Scene

  • Leviton Canada Announces Structural Changes to the Sales Organization

    Leviton Canada Announces Structural Changes to the Sales Organization

    January 16, 2025 Leviton Canada is pleased to announce structural changes to its Canadian Sales Department, effective January 1, 2025. These changes aim to enhance sales synergy, optimize resource allocation and strengthen their relationships with customers across the country. Jason Denstedt now assumes the role of Vice-President of National ED Sales, overseeing the national Electrical… Read More…

  • Nesco Announces New Sales Agent for Northern Ontario

    Nesco Announces New Sales Agent for Northern Ontario

    January 16, 2025 Nesco is pleased to announce the appointment of Sean Atkinson at Resilient Sales as their sales agent for Northern Ontario, effective January 1st, 2025. “Sean is replacing Steve Wallace, who after decades of providing tireless customer service and sales support is focusing on family and enjoying some well-deserved downtime in retirement,” commented… Read More…

  • ABB and Wieland Electric Partner to Redefine Efficiency in Modular Construction

    ABB and Wieland Electric Partner to Redefine Efficiency in Modular Construction

    January 15, 2025 ABB Electrification’s Smart Buildings Division and Wieland Electric have announced a strategic partnership to revolutionize modular and serial construction with advanced prefabricated electrical installation systems. The collaboration combines Wieland’s innovative connector technology with ABB’s extensive portfolio – including switches, sockets, installation boxes, energy distribution, and smart home solutions – to deliver plug-and-play… Read More…

  • ABB Expands Residential Energy Management Portfolio in North America with Lumin Acquisition

    ABB Expands Residential Energy Management Portfolio in North America with Lumin Acquisition

    January 15, 2025 ABB has announced the acquisition of Lumin, a U.S.-based pioneer and leading provider of responsive energy management systems, to expand its home energy management capabilities in the North American residential sector. The acquisition follows a strategic minority investment by ABB into the company in 2023. Financial terms of the transaction were not… Read More…