Ontario Building Code Amendments Propose to Mandate EV Infrastructure
December 4, 2016
Consultations are currently open on proposed changes to the Ontario Building Code. Among the proposals: requiring all new homes and townhomes with garages to be constructed with a 50-amp, 240-volt receptacle in the garage for the purpose of charging an electric vehicle, and requiring that all newly-built commercial office buildings and workplaces provide electric vehicle charging infrastructure.
The deadline for comment is December 20, 2016. Find out more: www.mah.gov.on.ca/Page14998.aspx



![Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54](https://electricalindustry.ca/wp-content/uploads/2022/11/Guide-CE-Code-2.png)







