Keeping the roof open: Retrofit of Rogers Centre’s retractable roof

Rogers Centre

The Rogers Centre’s roof and its systems had been meticulously maintained from the outset; however certain parts and components had been discontinued over the years, making the original technology outdated and difficult to maintain. As time went on, opening and closing the roof became more challenging. “I always equate it to this: Not many people are still driving a car they had 20 years ago,” said Dave McCormick, Engineering Manager, Rogers Centre.

The roof, which consists of three moving panels and one fixed piece, is 282 feet high at its center and covers 8 acres. Two of the panels slide under the fixed panel, then the final panel rotates around the stadium and into place until the four panels resemble a stack of plates. When opening or closing the roof, it has to be capable of quickly, reliably, and precisely moving 11,000 tons of steel in winds up to 40 miles per hour blowing from varying directions.

“As much as fans love seeing the sky, in this stats-heavy game, baseball fans also believe the Blue Jays do better when the roof is open which has made the roof an integral part of the game and the fan experience,” said Mark Niesner, Director of Operations and Organizational Development, New Electric, the general contractor for the Rogers Centre’s roof-related renovations.

To continue meeting the expectations of fans and promoters, the roof’s infrastructure required significant upgrades, including a new OT (Operations Technology) network and control system, which help management determine when to close the roof and provide them the ability to once again do so reliably. “Basically, what this project was about was getting this structure and the operating system back to a state where it can sustain for the next 15 to 20 years,” explained McCormick.

Successful replacement of the aging stadium roof OT network and controls system was completed through a number of organizations working in partnership. New Electric, acting as prime and electrical contractor, provided project management, electrical solutions and mechanical support. Rockwell Automation and Cisco provided product and technical expertise. Gerrie Electric provided product and assisted in testing and design. JMP Engineering provided the knowledge, experience and execution of the design installation and commissioned the entire control system.

Rogers Centre selected the team due to their combined proven expertise in successfully delivering critical projects. It was also important to Rogers that the partners had the ability to locally service and support the system during and over the life of the roof. For over 10 years, New Electric has managed Rogers Centre’s requirements, for everything from the roof and its power and control systems to its concession stands and ATMs, lights and the Blue Jays’ locker rooms. As a result, New Electric really understands Rogers Centre, its culture and unique requirements.

“Looking ahead, Rogers Centre committed to leading edge, proven technology to meet today’s standards,” said Steve Szamocki, Executive Vice President of Sales and Marketing, JMP Engineering. “Twenty-five years ago, this technology was leading edge but increasingly, these legacy systems had become a challenge to support effectively and efficiently.”

“Rockwell Automation is excited to have our PowerFlex® variable frequency drive solutions and ControlLogix® PLC’s be a cornerstone of this highly visible and critical roof modernization project,” said Mike Laszkiewicz, Vice President & General Manager, Power Control Business, Rockwell Automation. “Rogers Centre will now be able to achieve greater efficiency and reliability by integrating the roof system with the network and our control system, a vision that Rockwell Automation calls the Connected Enterprise.”

Completion of this retrofit required approximately two years, $10 million and close to 30 people simultaneously working full-time on the renovation. Thanks to the upgrades, the roof once again performs optimally, easily and with absolute reliability. To help Rogers Centre keep fans dry, New Electric also installed a rooftop weather station that tracks weather systems to predict when the rain or cold front will arrive.

While the opening and closing still requires a full crew to operate safety, the control system now only needs one person to monitor the process. The entire process can be completed with a 46% speed improvement as compared to the legacy control system. Also, of significant value to Rogers Centre, the enhanced functionality of the modern control system and its supporting OT network provides fault tolerance, self-diagnostics, and reporting previously not available, allowing the operator an easy and quick way to trouble-shoot and rectify any issues, should they arise.

“As general contractors, we can take on far more than the electrical and had the resources to accommodate Rogers Centre’s incredibly full event schedule,” said Niesner. “We don’t come in to just hook up wires – we’re here to help Rogers Centre give the fans a fantastic experience.”

New Electric

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…