Samsung and Pattern Development Complete 100 MW Belle River Wind Power Facility

Belle River Wind

Samsung Renewable Energy, Inc. (Samsung) and Pattern Energy Group LP (“Pattern Development”) have announced their 100 megawatt (MW) Belle River Wind power facility has completed construction and is fully operational. Belle River Wind is expected to generate enough clean energy to power approximately 35,000 Ontario homes each year, based on average annual residential energy use in Ontario.

“Samsung is proud to complete our fifth wind project under our Green Energy Investment Agreement with the government of Ontario,” said Eskay Lee, Vice President, Samsung C&T. “Belle River Wind created more than 235 jobs during peak construction. Samsung and its partner are creating jobs and investing in the community which are benefiting real people in Lakeshore and across the province.” 

“Pattern Development continues to grow in Canada. This is the fifth wind power facility we have completed in Ontario – and seventh across Canada – totaling nearly 1.3 gigawatts of operational capacity in the country, and we expect another project to reach completion this year in Quebec,” said Mike Garland, CEO of Pattern Development. “Belle River Wind is making a significant positive impact locally by generating millions of dollars in landowner payments, community benefits and tax revenue for the community around Lakeshore and for the local schools.”

Built with Ontario-made products, Belle River Wind provided jobs for more than 235 Ontario workers during construction and 12 permanent positions during operations. Towers for the 40 Siemens 3.2 MW wind turbines were made at CS Wind’s manufacturing facility in Windsor using Ontario steel. The 120 turbine blades were manufactured in Tillsonburg.

Belle River Wind is bringing strong economic benefits to the local community, including more than $2.5 million in direct spending over 20 years in property taxes and landowner lease royalties. In addition, Belle River Wind committed $6 million to the community of Lakeshore as part of a long-term Community Benefit Program, which supports education and other initiatives. This includes an initial contribution of $2 million and an annual contribution of $200,000 for the next 20 years.

Compared to coal-fired generation, the Belle River Wind facility will conserve enough water to meet the annual freshwater needs of nearly 9,000 Ontarians and avoid more than 300,000 tonnes of CO2 each year – the equivalent of taking more than 60,000 cars off the roads, according to emission rates from the Ontario Ministry of Environment and southwestern Ontario per capita water consumption from Environment Canada.

The Belle River Wind power facility operates under a 20-year power purchase agreement with the Independent Electricity System Operator (IESO).

http://www.newswire.ca/news-releases/samsung-and-pattern-development-complete-100-mw-belle-river-wind-power-facility-in-ontario-650058053.html

Related Articles


Latest Articles


Changing Scene

  • Leviton Canada Announces Structural Changes to the Sales Organization

    Leviton Canada Announces Structural Changes to the Sales Organization

    January 16, 2025 Leviton Canada is pleased to announce structural changes to its Canadian Sales Department, effective January 1, 2025. These changes aim to enhance sales synergy, optimize resource allocation and strengthen their relationships with customers across the country. Jason Denstedt now assumes the role of Vice-President of National ED Sales, overseeing the national Electrical… Read More…

  • Nesco Announces New Sales Agent for Northern Ontario

    Nesco Announces New Sales Agent for Northern Ontario

    January 16, 2025 Nesco is pleased to announce the appointment of Sean Atkinson at Resilient Sales as their sales agent for Northern Ontario, effective January 1st, 2025. “Sean is replacing Steve Wallace, who after decades of providing tireless customer service and sales support is focusing on family and enjoying some well-deserved downtime in retirement,” commented… Read More…

  • ABB and Wieland Electric Partner to Redefine Efficiency in Modular Construction

    ABB and Wieland Electric Partner to Redefine Efficiency in Modular Construction

    January 15, 2025 ABB Electrification’s Smart Buildings Division and Wieland Electric have announced a strategic partnership to revolutionize modular and serial construction with advanced prefabricated electrical installation systems. The collaboration combines Wieland’s innovative connector technology with ABB’s extensive portfolio – including switches, sockets, installation boxes, energy distribution, and smart home solutions – to deliver plug-and-play… Read More…

  • ABB Expands Residential Energy Management Portfolio in North America with Lumin Acquisition

    ABB Expands Residential Energy Management Portfolio in North America with Lumin Acquisition

    January 15, 2025 ABB has announced the acquisition of Lumin, a U.S.-based pioneer and leading provider of responsive energy management systems, to expand its home energy management capabilities in the North American residential sector. The acquisition follows a strategic minority investment by ABB into the company in 2023. Financial terms of the transaction were not… Read More…