New Canadian Electrical Code Now Available

CSA

January 12, 2018

CSA Group, a leading standards development organization and global provider of testing and certification services, has released the 2018 Canadian Electrical Code, Part I (CE Code).

First published in 1927, the CE Code is a critical component of Canada’s electrical safety system – a system that works to keep installers, consumers, and their families safe from harm. Updated every three years to reflect the latest advances in technology and other major developments, this original, authentic Canadian-based standard aims to help maintain and enhance safety amidst these changes.

“Building on a 90-year legacy, the latest edition of the CE Code enables electrical workers to follow best practices that help ensure safety as new technologies become embedded in our everyday lives – at home and at work,” says Mary Cianchetti, President of Standards at CSA Group.

Input from stakeholders is a critical component in developing the CE Code. CSA Group takes a consensus-based approach to all standards work, drawing on the expertise of over 1,600 in-house technical experts, as well as more than 9,000 volunteer subject-matter experts from across the globe.

The latest edition of the CE Code includes over 260 updates and revisions aimed at improving clarity through streamlined requirements; helping ensure safer installation and maintenance of electrical equipment; and supporting the safe implementation of new technologies and renewable energy solutions. Some of the major changes include:

  • A new sub-section of rules for power over Ethernet (POE) cables
  • The addition of demand factors for electric vehicle energy management systems
  • The installation of an identified conductor at each control location for energy management system control devices
  • Disconnecting means for certain LED luminaires
  • Tamper resistant receptacles in other areas where children may be present
  • Mandated ground fault circuit interrupter (GFCI) protection for electric heating devices and controls near wet areas
  • New requirements in Section 78 to help prevent electric shock drowning

To help users navigate the sheer number of changes and their impact on many different industries, CSA Group has developed a range of training solutions and electronic tools so organizations and their employees can work more safely and remain competitive.

http://www.csagroup.org/news_or_press/new-canadian-electrical-code-now-available/

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…