Rittal Offers New IoT Interface for Climate Control Solutions

Rittal

 

Janaury 17, 2018

Industry 4.0 scenarios such as Predictive Maintenance are based on the provision of data and networked communication. For this to happen, IoT-compatible devices equipped with the necessary communication options are required. With its new IoT interface, Rittal is now laying the foundation for the optimal integration of cooling units and chillers in Industry 4.0 applications. This makes continuous communication from the sensor to the cloud possible, as well as connection to superordinate monitoring or energy management systems.

A great deal of information is generated when it comes to operating modern climate control solutions in enclosures. Until now, it has only been practical to record operating hours and the current temperature inside the enclosure. But with modern devices like the new cooling units and chillers in the Rittal Blue e+ range, a multitude of values and other information can be measured and recorded. This includes the temperatures inside and outside the enclosure, the evaporator and condenser temperatures and, where appropriate, measurements from additional sensors located inside the enclosure. Instead of a simple operating hours meter, the run-times of the compressor and internal and external fan are recorded separately. There are also system messages, data for capacity utilisation and the current parametrisation information.

Tim Rourke, President, Rittal Systems Ltd., said, “Rittal is a pacesetter when it comes to introducing systems that respond to the customers’ needs for greater security, monitoring and energy savings. It is crucial for businesses to select systems that are IoT enabled in order to meet the challenges of Industry 4.0.”

Rittal

Creating added value from data

In order to generate added value from the high volume of data, the information must be made available to superordinate systems. To make the seamless communication of data possible, Rittal now offers its new IoT interface, which turns the cooling units and chillers in the Blue e+ range into IoT-compatible devices. The IoT interface can either be mounted on a top hat rail or directly on the cooling unit or chiller. The protocols supported are OPC-UA, Profinet, SNMP, Modbus and CANopen. The number of protocols supported makes it is possible to connect to superordinate monitoring or energy management systems in virtually every case. The data from the cooling units and chillers is then available in these systems at all times. It is also possible to set parameters and configure settings via the IoT interface.

Cloud connectivity

The information from the devices can also be used for a wide range of analyses. The communication options available through the new IoT interfaces make it possible to integrate the climate control solutions into IoT applications, paving the way for new applications and smart service solutions. For example, the options make optimisation of maintenance and servicing of climate control solutions possible, lowering operating costs. Another important application is energy data management. With all data available at all times, the level of energy efficiency is increased, which in turn helps reduce costs.

Check out Rittal’s new IoT video: Increase your machine availability with smart data use! https://www.youtube.com/watch?v=fsMNn3zdAlY

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…