Shopping Centre Parking Lot Shines Brighter Using Less Energy After LED Upgrade

Promenade

Sept 30, 2018

A lighting upgrade of the parking lot for the Promenades du Parc, an open strip shopping centre in St-Hubert, Quebec, will save approximately 57,000 kWh annually — a 55% reduction for the complex. The upgrade involved replacing 400W metal halides with 200W LED area lights.

In addition to cost savings, the new lighting has enhanced the aesthetics of the plaza, improved visibility, making a visit more welcoming and safer in the evenings, and eliminated light trespass onto nearby homes.

The complex was built in 1990 and covers 104,313 sq.ft., including ample customer parking for key tenants such as IGA, National Bank of Canada and Pharmaprix.

First Capital Realty operates the facility, and in early 2018 identified an opportunity to save energy and improve the overall aesthetics of the shopping centre by upgrading the parking lot lighting to LED technology. They turned to the lighting experts at Concept Illumination.

Prior to the lighting upgrade, the Promenades du Parc lot featured a mix of floodlights and other pole-mounted fixtures, all of which were 400W metal halides. Concept Illumination proposed 200W LED area lights to replace all 39 fixtures, standardizing the property’s lighting aesthetic. By choosing a fixture that directs light downward, brightness and uniformity have been dramatically improved across the lot. This project was also an opportunity to install eight 150W FL03 flood lights to illuminate the IGA supermarket façade.

The installation was completed in one day, resulting in minimal disruption to the tenants and their customers. Preparation was key – planning ahead and arriving on site with the proper mounting hardware and adaptors allowed for a smooth, fast installation from start to finish.

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 28 – Motors and Generators

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 28 – Motors and Generators

    Rule 28-000 – Scope states that Section 28is a supplementary or amendatory section of the code and provides additional and specific requirements for the installation, wiring methods, conductors, protection, and control of all motors and generators. Read More…

  • Statement by ECAO Executive Director, Graeme Aitken on Tariffs

    Statement by ECAO Executive Director, Graeme Aitken on Tariffs

    February 7, 2025 ECAO posted the following statement from Executive Director, Graeme Aitken on their website regarding potential U.S. Tariffs: For almost 80 years, the Electrical Contractors’ Association of Ontario (ECAO) has served and represented the interests of Ontario’s industry-leading, unionized electrical contractors. Over those many decades, ECAO has stepped up during times of challenge… Read More…

  • Rigid PVC Conduit vs. ENT in High-Rise and Multi-Use Applications

    Rigid PVC Conduit vs. ENT in High-Rise and Multi-Use Applications

    February 7, 2025 By Phil Crangi Choosing the right high-rise construction conduit can significantly impact project efficiency and costs. While rigid PVC (Polyvinyl Chloride) conduit may have a lower upfront cost, ENT (Electrical Nonmetallic Tubing) offers more significant advantages due to its long-term labor savings and installation efficiency. ENT and fittings form an integrated system… Read More…

  • EFC Tariff Response: Advocating for Free Trade

    EFC Tariff Response: Advocating for Free Trade

    February 7, 2025 STATEMENT FROM CAROL MCGLOGAN, PRESIDENT & CEO, ELECTRO-FEDERATION CANADA ON U.S. TARIFFS Electro-Federation Canada (EFC), representing Canada’s electrical and automation industry, strongly opposes the recent tariffs announced (an subsequently delayed) by President Trump on Canadian imports. These tariffs threaten to disrupt North American supply chains, increase costs for businesses and consumers, and… Read More…


Changing Scene