Schneider Electric Connects Container Ships to Shore Power Electrical in Vancouver

Schneider

Jan 28, 2019

A Schneider Electric Canada Inc. solution chosen by the Vancouver Fraser Port Authority is reducing greenhouse gas (GHG), air emissions and noise from ships while docked at the port’s Centerm Container Terminal.

The solution, a Schneider Electric EcoStruxure Platform design, allows docked ships to shut down their engines and be powered using a “plug-in” electrical shore power connection. Shutting down the engines helps to reduce air pollution. The shore power capability also qualifies a ship for the Vancouver Fraser Port Authority’s EcoAction program, providing discounted harbour dues and the opportunity to be recognized with a Blue Circle Award. The system was successfully commissioned and connected to the first ship on October 15, 2018.

The shore power solution is operated by DP World Vancouver. The standards-compliant system was designed and commissioned by Schneider Electric Canada Inc. and PBX Engineering of Vancouver, and installed by Houle Electric. The solution relies on clean electricity from BC Hydro to power the ships, which allows them to shut down their diesel engines. The project was made possible through the vision and environmental stewardship of the Vancouver Fraser Port Authority and through funding support from Transport Canada.

“As Canada’s largest and busiest port, we must balance growth in trade with the need to protect our environment and respect the quality of life of our neighbours,” says Tom Corsie, Vice President Real Estate of the Vancouver Fraser Port Authority. “Shore power is just one of the ways we are working towards improving air quality and reducing marine shipping emissions. Over 60 hours of shore power use, one large container ship will reduce its greenhouse gas emissions by an anticipated 95 tonnes and save about 31 tonnes of fuel. This not only helps the environment, but also positions British Columbia’s trade sectors to take advantage of growth opportunities and ensure our competitiveness in this market.”

The Schneider Electric design was chosen due to its local presence, technical expertise and proven experience within the marine shore power arena.

“As part of our continued focus on sustainability and green power solutions, we at Schneider Electric Canada are very proud of the shore power solution at the Port of Vancouver terminal and the impact it will have to reduce greenhouse gases, air emissions and noise,” says Susan Uthayakumar, president of Schneider Electric Canada Inc. “This reinforces our global vision to be recognized as a leader in environmental sustainability.”

EcoStruxure is Schneider Electric’s open, interoperable, IoT-enabled system architecture and platform. EcoStruxure has been deployed in 480,000+ sites, connecting over 1.6 million assets under management through 40+ digital services.

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…