Nu-Tech Precision Metals Inc. to Begin Delivery of Pressure Tubes to Bruce Power for Major Component Replacement Project

EIN NuTech Bruce 400

Oct 17, 2019

Nu-Tech Precision Metals Inc., a long-time supplier to the Canadian nuclear industry, is ready to begin the delivery of zirconium alloy pressure tubes for the Unit 6 Major Component Replacement (MCR) Project.

Nu-Tech will begin shipping tubes to Bruce Power this month for the Unit 6 project – which will begin in January 2020 – and is scheduled to complete the order next August.  Approximately 50 per cent of the tubes for Unit 6 are in various stages of manufacture at the Nu-Tech facility in Arnprior, ON, and almost 15 per cent of the order has been already completed.

The MCR Project is part of Bruce Power’s Life-Extension Program, which started in January 2016 and includes Units 3-8. By extending the life of Bruce Power’s reactors to 2064, the company will create and sustain 22,000 jobs annually, both directly and indirectly, across Ontario, while investing $4 billion a year into the province’s economy. At the same time, Bruce Power will produce 30 per cent of Ontario’s electricity at 30 per cent less than the average cost to generate residential power, while also producing zero carbon emissions.

John Yakabuski, MPP for Renfrew-Nipissing-Pembroke and Minister of Natural Resources, also emphasized the importance of Bruce Power’s relationship with Nu-Tech for local communities.

The long-term agreement has long-term benefits for the people and communities that Nu-Tech touches.

“For Nu-Tech, the ongoing commitment from Bruce Power allows the company to continue supporting Arnprior and Renfrew County by providing stable employment and helping to fund public services in the surrounding communities,” said George Legate, President of Nu-Tech Precision Metals Inc.

“This 10-year contract from Bruce Power for just over 3,000 pressure tubes equates to millions of dollars a year being injected into Renfrew County through the salaries paid to our employees and money flowing to our supply base located throughout the Ottawa Valley. It will also allow us to continue to provide financial assistance with the delivery of services in the Arnprior and McNab/ Braeside area.”

Source

Related Articles


Latest Articles

  • Why Business ERP Software Integrations Matter for Modern Estimating Teams

    Why Business ERP Software Integrations Matter for Modern Estimating Teams

    March 2, 2026 By Melvin Newman, Patabid CEO Construction estimating is a high-stakes game. For large electrical contractors managing multiple projects, millions in material costs, and dozens of estimators, the margin for error is razor-thin. A misquoted job doesn’t just lose money—it can tie up crews, strain supplier relationships, and ripple through your entire operation. Read More…

  • Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    March 2, 2026 This International Women’s Day, the Ontario Building and Construction Tradeswomen (OBCT) proudly celebrates the leadership, resilience, and collective power of women in the trades across Ontario. This year’s theme is Give to Gain, which highlights the strength of reciprocity and collective support. When tradeswomen, organizations, and communities uplift each other through generosity, opportunities for women Read More…

  • Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    March 2, 2026 This recall involves Purevolt Photoelectric Smoke Detector model SD119-4 for fire alarm systems, compatible with 4 wires, 12V DC. The product measures 100mm x 48mm and is intended for indoor use, with ceiling or wall mounting. The model number can be found on the label affixed to the back of the product. Issue Health Canada’s sampling Read More…

  • Sustainable Urban Development Starts with Streetlighting Transformation in Val-D’or

    Sustainable Urban Development Starts with Streetlighting Transformation in Val-D’or

    March 2, 2026 The City of Val-d’Or, in the heart of Quebec’s Abitibi-Témiscamingue region, undertook a major streetlight revitalization project on 7th Street, a principal north-south artery. By updating public lighting, it would improve energy efficiency, give this iconic area a contemporary look, and preserve its urban identity. Old streetlights on 7th Street had been Read More…


Changing Scene