Legrand Honored by 2019 Cabling Installation & Maintenance Innovators Awards

PB 27 Legrand CablingInnovatorsAward 400

Oct 23, 2019

Legrand North and Central America announced that its data infrastructure solutions were recognized among the best in the industry by the 2019 Cabling Installation & Maintenance Innovators Awards. The stellar third-party judging panel included cabling and communications system specifiers, designers, integrators and managers with vast professional experience.

Legrand was recognized as a Gold and Silver honoree spanning five separate solutions.

“On behalf of the Cabling Installation & Maintenance Innovators Awards, I would like to congratulate Legrand on their Gold and Silver–level honoree status,” said Cabling Installation & Maintenance’s Chief Editor Patrick McLaughlin. “This competitive, unbiased program celebrates the most original and innovative products in the Industry.”

Intellicore – Softawre-Defined Connectivity – Gold

Intellicore utilizes software defined networking (SDN) to offer you an alternative topology in your data center that gives you full software control and software cross connection capability for each fiber “lane” in your fiber network. Intellicore merges SDN with Legrand’s fiber connectivity and physical infrastructure solutions to enable complete software integrated physical networking capability.

LP-Series Power Distribution Units – Gold

Legrand’s new line of LP-Series Power Distribution products offers customers a blended solution of functionality and cost savings. The single-phase line of PDUs comprises of models that can be mounted vertically or horizontally, fitting into most applications found in commercial LAN environments or smaller data centers. Legrand implemented several features into this new line of basic, network-metered or network-switched PDUs that are designed to improve the installation experience and management of a rack’s power distribution.

Clarity Shielded High Density Jack – Silver

The Clarity Shielded High Density Jack (HDJS) utilizes Legrand’s innovative rear-loading HDJ footprint, allowing for compatible installation into existing HDJ mounting solutions and new shielded modular patch panels. In addition, due to the shared HDJ footprint, fiber and A/V modules can be installed alongside copper modules in any HDJ mounting solution, allowing for mixed media within the same rack unit or device-end mounting solution.

Infinium Fiber Splice Cassette – Silver

Legrand’s Splice Cassettes enable fast field termination and provides cable management within the housing. They are designed for use with either Single-Mode (OS2) or Multimode (OM3/OM4) fiber, features 12 or 24 fibers in LC Duplex, LC Quad, or SC Duplex connector styles. Both the 12 and 24 fiber cassettes support fusion splicing of individual or ribbon fibers. Heat shrinks, pigtail slack and cable slack are all managed within the cassette and eliminates the need for individual splice trays or special housings. Splicing can also be done away from the rack housing if needed.

EZ Patch Flat Pack – Silver

With EZ Patch Flat Pack, all the patch cords are laid out flat in a single plastic bag in quantities of 12 or 24 patch cords. Due to the flat package and arrangement of cords there is no cable memory to deal with when removed from the packaging, and a contractor can quickly populate a patch panel without opening multiple bags or removing tie wraps. The result is less overall waste and reduced installation time, simplifying the experience. EZ Patch Flat Pack also comes in standard and reduced (28 AWG) diameters from CAT 5e to CAT 6A.

Source

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 By William (Bill) Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric had been teasing a major announcement on their social media recently, before finally announcing last week they have rebranded as Bernie’s Electric Supplies Ltd, a nod to the company’s founder and legacy. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…