Schneider Electric Showcases Digitization of Supply Chain with Evreux Distribution Centre

EIN SE France 400

Nov 8, 2019

Schneider Electric has successfully digitized the entire supply chain of its Evreux international distribution center in Normandy, France. In order to address challenges brought about by new technologies, better serve its customers, and improve operational and energy efficiency, Schneider Electric has deployed its EcoStruxure solutions at the site – one of its largest European distribution centers.

Transformation of the Evreux distribution center is a key part of the company’s Tailored Sustainable Connected (TSC) 4.0 supply chain digitization strategy, which aims to improve the quality of logistics operations and responsiveness in order to personalize customer service and increase the efficiency of its logistics and warehousing operations. The Evreux Smart Distribution Center is one of the largest in Europe and covers around 463,000 square feet. Operating 24 hours, five days a week, the Normandy site dispatches 17,000 order lines a day to destinations across Europe.

The Evreux Smart Distribution Center is part of Schneider Electric’s global Smart Distribution Center program, devised to meet the needs and expectations of the digital economy by integrating innovative technologies, IT solutions, and data analytics into its existing logistics operations. As the world becomes more digitized, customers expect to be able to place their orders at any time and then track them in real-time. In this context, it was essential to digitize the Evreux site’s operations for end-to-end integration using solutions based on its EcoStruxure architecture.

An HQE-certified logistics center with improved energy performance

In addition to its digital transformation, the Evreux site is also undergoing a real energy transformation to enhance its performance while reducing its energy consumption. To achieve this, Schneider Electric has deployed its EcoStruxure Power and EcoStruxure Building solutions, cutting overall energy costs by 10% since 2017. Thanks to these EcoStruxure solutions, teams can now control air conditioning and variable speed drives remotely, as well as optimize vehicle loading time to avoid overloads. Overall, Schneider Electric’s goal was to find a solution to ensure that its energy bill reflects its actual consumption and, thus, reduce its carbon footprint.

The Normandy platform receives about 180 semi-trailers per day, counting nearly 4,500 pallets and 5,000 cardboard boxes. Schneider Electric moves further in reducing its environmental footprint by implementing two circular economy systems in the center, nearly 56% of the received boxes are recycled via local partnerships while the pallets are sent to neighboring Norman factories for reuse. Thanks to the “Loading factor” program, Schneider Electric also maximizes the boxes arrangement within each truck to reduce their number.

“In light of the current environmental context, it is essential for industry players to reduce their environmental footprint by managing their energy consumption. Therefore, logistics centers must address energy efficiency issues that go beyond their buildings, by implementing recycling and emission reduction initiatives. This is about meeting the expectations of our customers who are increasingly concerned with environmental.” says Marc Fromager, Vice President, Industrial Automation, Schneider Electric, France.

Source

Related Articles


Latest Articles

  • Maximizing Excel: Practical Use Cases for Preconstruction

    Maximizing Excel: Practical Use Cases for Preconstruction

    November 8, 2024 By Melvin Newman Excel is a powerful and flexible tool that can enhance efficiency in electrical construction estimating.  Spreadsheets, like those in Excel, consist of a grid of “cells” where each cell can hold various types of data. Originating from mainframe computers in the 1960s and later developed for Apple computers in… Read More…

  • The Non-Residential Sector Declines in All Three Components Despite Sustained Industrial Permit Level

    The Non-Residential Sector Declines in All Three Components Despite Sustained Industrial Permit Level

    November 4, 2024 The total value of building permits in Canada decreased by $858.1 million (-7.0%) to $11.5 billion in August, following a strong July during which construction intentions rose sharply (+20.8%). The residential and non-residential sectors contributed to the decrease in August. On a constant dollar basis (2017=100), the total value of building permits decreased 7.6% in… Read More…

  • A Slight Decrease in Residential Building Construction for August

    A Slight Decrease in Residential Building Construction for August

    November 4, 2024 Investment in building construction edged up 0.2% to $21.0 billion in August, after a 1.6% decrease in July. The residential sector edged down (-0.1%) to $14.6 billion, while the non-residential sector was up 1.0% to $6.4 billion. Year over year, investment in building construction grew 7.2% in August. On a constant dollar basis (2017=100), investment in building construction was… Read More…

  • When a Familiar Door Closes

    When a Familiar Door Closes

    November 4, 2024 By Keith Sones, seasoned utility industry executive Most of the articles I’ve written have been based on personal experiences, many of them occurring decades ago, which eventually translate into helpful life lessons. The years allow the events to marinate in a savoury stew of time and reflection, clarity never coming immediately, or even… Read More…


Changing Scene