EPLAN Introduces EPLAN Platform Version 2.9

PBUS 1 3 Eplan new 400

Dec 10, 2019

In EPLAN Platform, Version 2.9, QR codes can be easily generated. Users can store hyperlinks in their documentation that can later be scanned and opened with apps on mobile devices such as smartphones or tablets. It can be used for both internal and external links, making tedious typing a thing of the past. The QR code also works on printed documentation, making it faster and easier to use. Exchanging symbols in placeholder objects has also been simplified and they can now be replaced by selecting the appropriate value sets. Users benefit from greater transparency with fewer macro variants.

Dockable Layers Management

Layers Management has been made even easier than before as a dockable dialogue: all changes are now saved automatically. Additional functionality, including searching layers and changing their properties round off the improvements. Starting now, it is easy to search a project for all objects that have been assigned to a particular layer in a project or subproject. Designers can then use the Properties dialogue of a found object in the search results list to change the assignment of the layer they just searched for. This allows layers that were added to a project via DXF or DWG import to be easily found, quickly modified and used as user-defined layers. An additional benefit is that users can implement company standards with simple adaptations and definitions, analogous to the navigators.

Quickly reaching the goal: Navigator display

The list view of the Macro Navigators was changed into a table with cells in the previous version of EPLAN Platform, which can be edited fairly easily as a result. In the newest version, this function was expanded to additional navigators, for instance the Parts Navigator, PLC Navigator and Wire Navigator. This gives Version 2.9 powerful practical advantages since project data can now be edited en masse in the blink of an eye. Speaking of macros, once a macro project is completed, standardised macros can be inserted into other projects from the Macro Navigator using drag & drop. It naturally also works within a macro or schematic project in which the user has created the window and symbol macros. This results in considerable time savings because the previous cumbersome selection via the macro selection from the directories is no longer necessary. An additional plus is that data are being re-used, which ensures and increases the project quality.

Cleverly configured: Property arrangements

The new Management dialogue makes it much easier for users to edit user-defined property arrangements for schematics and 3D device placement. Users can check these in the Management dialogue and easily remove user-defined property arrangements that aren’t being used. A Context menu helps users easily find the used properties. The benefits are clear: All the property arrangements existing in a project can be displayed in one place. Furthermore, several properties can be edited simultaneously when exporting and importing property arrangements for different components. The names can also be just as easily translated, and the new search possibilities assist in making adjustments to implement company standards even faster.

Translations: Much clearer

In Version 2.9, multilingual entries can be made for many properties and input fields in both projects and Parts Management. User can then manually translate them into a uniform language or have it done automatically. EPLAN Platform, Version 2.9, now provides an extra helping of clarity: fields for which multilingual input is possible are now marked at the front with an icon on the user interface as the standard. How does it work? When the designer enters a text into a multilingual field, it is initially language-independent. In case it needs to be translated, it will then be assigned to the specified source language.

Source

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 By William (Bill) Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric had been teasing a major announcement on their social media recently, before finally announcing last week they have rebranded as Bernie’s Electric Supplies Ltd, a nod to the company’s founder and legacy. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…