Containerized Power Equipment for Temporary Facilities

EIN ASCO covid 400

April 30, 2020

ASCO Technologies’ last Tech Brief indicated that power outages remain an operational condition that will affect temporary facilities as they affect any other facility. Because of the present interest, they wanted to describe common options for getting backup power equipment onsite to mitigate outages at temporary facilities. 

At the heart of a backup power system is a transfer switch that connects load to an alternate power source, which will presumably be a generator. Options for housing these include the following. 

Option 1: Placing Equipment Outside of a Structure 

Critical power equipment such as a transfer switch can be installed on a hard surface or even on skids if sited temporarily. If used, this configuration would most likely be used with a tent-based solution. Note that this approach requires protecting the unit from weather and unauthorized access, and, if vehicles could be present, from accidental vehicular contact. 

Providing two of these protections is a matter of selecting an appropriate enclosure. Specifying a UL50 or NEMA 250 Type 3R enclosure with door-over-door construction can provide weather and access protections. For more information, see our white papers entitled Equipment Enclosure Classifications and Selecting Secure Enclosures. For protection from vehicles, parking bollards can be installed. 

Option 2: Placing Equipment in a Shed or Shipping Container 

Critical power equipment can be placed within a shelter, a shed, or a shipping container. This can provide the three types of security referenced above. While the equipment can be installed into the structure after it is delivered to the site, deployment efficiency may be improved by installing the equipment off-site prior to delivery, particularly where multiple units will be needed. 

Option 3: Pre-Installing Equipment in Modular Structures 

A third option is to install prefabricated building modules pre-fitted with power equipment. In this instance, the critical power equipment is installed together with the remainder of the power distribution system, which uses the same design in successive units. The transfer switch can be located in a compartment or room with other electrical gear. This video at Businesswire gives a sense of the scalability of modular options. 

Advantages of Prefabricated Containerized Equipment 

Constructing facilities utilizing containerized equipment offers the following potential advantages:

  • Installing all electrical equipment onsite can require more labor at the site. Prefabricating the equipment at an off-site workspace can be more efficient. It can also reduce the amount of onsite personnel, which can make for a safer construction environment and help maintain the social distancing practices now needed.
  • In some regions, finding qualified installers can be hard. Reducing onsite labor requirements can reduce problems encountered in tight construction labor markets.
  • After a site is prepared, prefabricated units can be dropped on-site and then quickly connected to power feeds and control systems. Because they are pre-tested, constructors receive functional equipment that streamlines on-site commissioning and testing.
  • Should further expansion become necessary, standardized designs in modular units streamline deployment and connection of additional modules to the temporary facility.

Prefabricating electrical equipment in containers is a practice that’s been around for many years. The current build-out of temporary medical facilities has made it especially relevant now.

Go HERE for more information

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 28 – Motors and Generators

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 28 – Motors and Generators

    Rule 28-000 – Scope states that Section 28is a supplementary or amendatory section of the code and provides additional and specific requirements for the installation, wiring methods, conductors, protection, and control of all motors and generators. Read More…

  • Statement by ECAO Executive Director, Graeme Aitken on Tariffs

    Statement by ECAO Executive Director, Graeme Aitken on Tariffs

    February 7, 2025 ECAO posted the following statement from Executive Director, Graeme Aitken on their website regarding potential U.S. Tariffs: For almost 80 years, the Electrical Contractors’ Association of Ontario (ECAO) has served and represented the interests of Ontario’s industry-leading, unionized electrical contractors. Over those many decades, ECAO has stepped up during times of challenge… Read More…

  • Rigid PVC Conduit vs. ENT in High-Rise and Multi-Use Applications

    Rigid PVC Conduit vs. ENT in High-Rise and Multi-Use Applications

    February 7, 2025 By Phil Crangi Choosing the right high-rise construction conduit can significantly impact project efficiency and costs. While rigid PVC (Polyvinyl Chloride) conduit may have a lower upfront cost, ENT (Electrical Nonmetallic Tubing) offers more significant advantages due to its long-term labor savings and installation efficiency. ENT and fittings form an integrated system… Read More…

  • EFC Tariff Response: Advocating for Free Trade

    EFC Tariff Response: Advocating for Free Trade

    February 7, 2025 STATEMENT FROM CAROL MCGLOGAN, PRESIDENT & CEO, ELECTRO-FEDERATION CANADA ON U.S. TARIFFS Electro-Federation Canada (EFC), representing Canada’s electrical and automation industry, strongly opposes the recent tariffs announced (an subsequently delayed) by President Trump on Canadian imports. These tariffs threaten to disrupt North American supply chains, increase costs for businesses and consumers, and… Read More…


Changing Scene