National Building Permits for January 2021

EIN BP Jan 400

Mar 3, 2021

January rang in the new year with a record high total value of building permits issued, rising 8.2% to $9.9 billion and surpassing the previous record of $9.6 billion set in April 2019. These gains were driven primarily by the residential sector.

Residential sector surges to new heights

The value of permits issued in the residential sector increased 10.6% to $7.1 billion in January—rising past the previous peak of $6.5 billion posted two months earlier. Provincial highs were reported in Ontario, Quebec, New Brunswick and Manitoba.

The majority of the rise in the residential sector was attributable to single-family homes, which climbed 15.1% to a record $3.5 billion—the eighth increase in nine months. Continuing the upward trend observed since October, the value of single-family permits issued in Quebec soared, rising 40.3%. Much of the gain came from regions outside of census metropolitan areas (CMAs).

Multi-family permits increased 6.5% to $3.5 billion, mainly driven by higher construction intentions in Ontario (+17.1%), where several permits in excess of $100 million were issued for condominium apartments in the CMA of Toronto. Conversely, the value of multi-family building permits in Quebec fell for a fifth consecutive month in January.

Non-residential sector up modestly in January

The total value of permits issued for non-residential buildings rose 2.6% to $2.8 billion in January after a 10.8% drop in December.

Following three consecutive monthly declines, industrial permits bounced back to average 2020 levels, increasing 31.7% to $535 million in January. High-value permits for an Amazon warehouse in Lachine, Quebec, and for two Eglinton Crosstown light rail transit stations in Toronto helped reverse the downward trend.

The value of commercial permits increased 3.3% to $1.5 billion. Six provinces posted increases in this component, led by Ontario (+14.7%) and Quebec (+20.4%).

Within the institutional component, municipalities issued permits worth $781 million, 11.8% lower than December. Values in Newfoundland and Labrador returned to typical levels following a $170 million hospital renovation permit issued in Corner Brook the previous month, pushing the national total lower.

To explore the impact of COVID-19 on the socioeconomic landscape, please consult the Canadian Economic Dashboard and COVID-19.

or more information on housing, please visit the Housing Statistics Portal.

Statistics Canada has a Housing Market Indicators dashboard. This web application provides access to key housing market indicators for Canada, by province and by CMA. These indicators are updated automatically with new information from monthly releases, giving users access to the latest data.

Go HERE for more information

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…