Hydro-Québec Inaugurates its First Two Solar Generating Stations

EIN HyrdoQ 125

 July 8, 2021

EIN 27 hydro quebec 400For the first time in Hydro-Québec’s history, solar power is now supplying the company’s grid. Gabrielle-Bodis generating station, located in La Prairie, and Robert-A.-Boyd generating station in Varennes were inaugurated in late June.

The generating stations have a combined installed capacity of 9.5 MW and will be able to generate close to 16 GWh of solar power annually—equivalent to the consumption of 1,000 residential customers. These facilities will help Hydro-Québec determine whether solar power is a good fit for generating fleet, transmission grid and the Québec climate.

“I am very proud that the generating station in La Prairie pays tribute to Gabrielle Bodis,” stated Sophie Brochu, President and CEO of Hydro-Québec. “She was the very first woman to earn an engineering degree from Polytechnique Montréal and she worked for Hydro-Québec for over 35 years. It is also the first Hydro-Québec facility named after a woman. As for the generating station in Varennes, we are highlighting the major contribution by a former President and CEO of Hydro-Québec, Robert A. Boyd, to whom we owe the success of the hydropower development in the Baie-James region and the francization of engineering in Québec. He also contributed to the creation of Hydro-Québec’s research institute, which is also the site of the generating station that bears his name.”

“We are pleased that Québec is entering the field of solar power generation by leveraging the expertise of local firms, both for the construction of the generating stations—with Borea—and for the purchase of some of the panels—with Stace,” added Jonatan Julien, Minister of Energy and Natural Resources.

Source

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene